A-4
Cisco Firepower Management Center 750, 1500, 2000, 3500, and 4000 Hardware Installation Guide
Appendix A Memory Upgrade Instructions for Firepower Management Centers
Removing the Chassis Cover
Step 1
Observe the ESD precautions described in
Working in an ESD Environment, page A-2
and the safety
Step 2
Remove the security screws from the front of the chassis:
•
For Rev. 1, there are two (2) screws (see “1” in
).
•
For Rev. 2, there are three (3) screws (see “1” in
).
Step 3
Remove the security screw from the rear of the chassis. See “2” in
and
.
Step 4
Slide the cover towards the rear by pushing on the blue grip points on the chassis cover:
•
For Rev. 1, there is one (1) grip point (see “3” in
).
•
For Rev. 2, there are two (2) grip points (see “3” in
Step 5
Lift the over off and set aside.
What to Do Next:
•
Remove the processor air duct as described in the
“Removing the Processor Air Duct from
Firepower Management Center 750” section on page A-6
Figure A-1
Removing the Cover from a MC750 Rev. 1
1
Front security screws
3
Rubber grip point
2
Rear security screw
4
Top cover