OL-30544-01
21
Introduction
This chapter describes the behavior of the front panel indicators when
the residential gateway is first powered up, during normal operations,
and in special conditions.
3
Chapter 3
Operation of Front Panel
Indicators
In This Chapter
Initial Power On, Calibration, and Registration (AC Power
applied) ...............................................................................................22
Normal Operations (AC Power Applied) ........................................23
Special Conditions..............................................................................24