
Figure 2: Power Shelf Grounding Brackets—Modular Configuration DC Power Shown
Two M6 hex nuts attaching grounding L-bracket to
shelf grounding bracket
5
Chassis ground cable
1
Grounding L-bracket
6
Two M6 hex bolts attaching ground lug to chassis
2
Four M6 hex bolts attaching shelf grounding bracket
to power shelves
7
Shelf grounding bracket
3
Two M6 hex bolts attaching grounding L-bracket
to chassis
4
Installing the Chassis Ground Cable
This section describes how to install the ground cable on the LCC.
Installing and Removing Power Components
5
Installing and Removing Power Components
Installing the Chassis Ground Cable