
C H A P T E R
7
Connecting the Router
This section presents installation instructions for the Cisco Catalyst Industrial Router 8140 Heavy Duty Series
Router (IR8140H or router). The procedures you follow depend on your network environment and requirements.
These topics are discussed:
•
•
Connecting to AC Power, on page 58
•
•
Checking the System (SYS) LED, on page 61
•
Additional Router Connections, on page 62
•
Connecting the Console Port, on page 65
•
Connecting the SFP Port, on page 66
•
Connecting the Ethernet Port, on page 70
•
Connecting the Alarm Port, on page 73
•
Installing Modules and Antennas, on page 73
Before Installing
Read the safety warnings in this section and
Installation Safety and Site Preparation
before beginning the
installation procedures.
Prepare the Installation Site
These procedures assume that the installation site is prepared according to the information in
Safety and Site Preparation, on page 19
Preventing Electrostatic Discharge Damage
Many of the these components are sensitive to electrostatic discharge (ESD) damage, which can occur when
electronic cards or components are handled improperly, results in complete or intermittent failures.
To prevent ESD damage, follow these guidelines:
• Always use an ESD wrist or ankle strap and ensure that it makes good skin contact.
• Connect the equipment end of the strap to an unfinished chassis surface.
Cisco Catalyst IR8140 Heavy Duty Series Router Hardware Installation Guide
57