Catalyst 2960-S Switch Hardware Installation Guide
OL-19732-04
Chapter 2 Switch Installation
Planning a Switch Stack
Figure 2-7
Stack with Half Bandwidth Connections
shows a stack with a bad FlexStack cable in link B. This stack provides only half bandwidth
and does not have redundant connections.
Figure 2-8
Stack with a Failover Condition
shows a stack with a bad link B. This stack partitions into two stacks, and switch 1 and
switch 3 are stack masters.
Figure 2-9
Partitioned Stack with a Failover Condition