2-4
Catalyst 2350 Switch Hardware Installation Guide
OL18479-01
Chapter 2 Switch Installation
Preparing for Installation
Warning
When installing or replacing the unit, the ground connection must always be made first and
disconnected last.
Statement 1046
Warning
Installation of the equipment must comply with local and national electrical codes.
Statement 1074
Statement 371—Power Cable and AC Adapter
Caution
To comply with the Telcordia GR-1089 Network Equipment Building Systems (NEBS) standard for
electromagnetic compatibility and safety, connect the Ethernet cables only to intrabuilding or
nonexposed wiring or cabling.
Caution
To comply with the Telcordia GR-1089 NEBS standard, PoE or non-PoE 10/100/1000 Ethernet port
cables that exit from either the left side or right side of the switch should be routed and tied to the nearest
rack metal hardware.
Note
The grounding architecture of this product is DC-isolated (DC-I).