![Cisco ASR 5500 Скачать руководство пользователя страница 51](http://html.mh-extra.com/html/cisco/asr-5500/asr-5500_installation-manual_63728051.webp)
Outer sleeve
2
Cardboard top
1
Accessory box
4
Inner Sleeve
3
End cap
6
Foam Cap
5
Plastic bag (not shown)
8
Pallet
7
Step 3
Lift the outer cardboard sleeve up and over the top of the chassis.
Step 4
Lift the inner cardboard sleeve up and over the top of the chassis.
Step 5
Remove the accessory box. This box contains miscellaneous hardware items and spare air filters.
Step 6
Remove the foam cap from the top of the chassis.
Step 7
Remove the bottom front and rear end caps from the base of the chassis.
Step 8
Remove the plastic bag that covers the chassis.
Step 9
If you will be removing chassis components to reduce the weight of the chassis, leave the chassis on the pallet and
proceed to
Reducing the Weight of the Chassis Prior to Installation, on page 35
Step 10
Use a chassis lift or multiple craftpersons to lift or slide the chassis off the shipping pallet. Proceed to
Chassis, on page 40
.
Reducing the Weight of the Chassis Prior to Installation
You can reduce the weight of the chassis prior to installation by removing the upper and lower fan trays, and
the PFUs. Follow the instructions below to safely remove these components prior to installation.
During installation, maintenance and/or removal, wear a grounding wrist strap to avoid ESD damage to
the components. Connect the strap to a ground point on the rack/cabinet frame. Failure to do so could
result in damage to sensitive electronic components and potentially void your warranty.
Caution
Removing the Fan Trays
To avoid personal injury and/or damage to the fan trays, be sure to support each fan tray's weight from
its front and rear as you slide it completely out of the chassis.
Caution
ASR 5500 Installation Guide
35
Chassis Installation
Reducing the Weight of the Chassis Prior to Installation
Содержание ASR 5500
Страница 12: ...ASR 5500 Installation Guide xii Contents ...
Страница 16: ...ASR 5500 Installation Guide xvi About this Guide Contacting Customer Support ...
Страница 40: ...ASR 5500 Installation Guide 24 Technical Specifications Chassis Grounding ...
Страница 74: ...ASR 5500 Installation Guide 58 Card Installation Save Shipping Cartons ...
Страница 88: ...ASR 5500 Installation Guide 72 MIO Port Cabling Cleaning Fiber Optic Connectors ...
Страница 112: ...ASR 5500 Installation Guide 96 System Power up show leds Command ...
Страница 130: ...ASR 5500 Installation Guide 114 Initial System Configuration Additional Configuration Tasks ...
Страница 164: ...ASR 5500 Installation Guide 148 Replaceable Components Returning Failed Components ...
Страница 186: ...ASR 5500 Installation Guide 170 Console Port to Cisco Server Cabling Configuration ...
Страница 192: ...ASR 5500 Installation Guide 176 RMA Shipping Procedures Rear Cards ...