SPIO Cross-Connect Bus
To provide redundancy between Switch Processor I/O (SPIO) cards, the system possesses a physical
interconnect between the ports on the SPIOs. This cross-connect allows management traffic or alarm outputs
to be migrated from an active SPIO experiencing a failure to the redundant SPIO.
While an SPIO should be installed directly behind its corresponding SMC, this bus allows either SMC to
utilize either SPIO.
Power Filter Units
Located at the bottom rear of the chassis are slots for two 165-amp Power Filter Unit (PFU) assemblies. Each
PFU provides DC power from the site's power distribution frame (PDF) to the chassis and its associated cards.
Each load-sharing PFU operates independently of the other to ensure maximum power feed redundancy. The
maximum input operating voltage range of the PFU is -40 VDC to -60 VDC; the nominal range is -48 VDC
to -60 VDC.
The ASR 5000 does not offer an AC power supply option. If only AC power is available at the installation
site, an adequately sized AC-to-DC converter will be required to supply -48 VDC power to the chassis.
Important
The following drawing shows the PFU and its connectors.
Figure 6: PFU Components
Table 5: Power Filter Unit Component Descriptions
Description
Item
Plastic terminal cover
1
ASR 5000 Installation Guide
11
ASR 5000 Hardware Platform Overview
Power Filter Units
Содержание ASR 5000
Страница 16: ...ASR 5000 Installation Guide xvi About this Guide Contacting Customer Support ...
Страница 64: ...ASR 5000 Installation Guide 48 Installation Procedure Overview Laser Notice ...
Страница 100: ...ASR 5000 Installation Guide 84 Line Card Installation Installing the XGLC ...
Страница 118: ...ASR 5000 Installation Guide 102 Cabling the Switch Processor Input Output Line Card Central Office Alarm Wiring Example ...
Страница 122: ...ASR 5000 Installation Guide 106 Cabling the Fast Ethernet 10 100 Line Card FLC2 Interfaces ...
Страница 136: ...ASR 5000 Installation Guide 120 Cabling the Optical ATM Line Cards Cabling the Optical SFP Interface ...
Страница 140: ...ASR 5000 Installation Guide 124 Cabling the Channelized Line Cards Cabling the Optical SFP Interface ...
Страница 144: ...Figure 49 PFU Wiring Diagram ASR 5000 Installation Guide 128 Cabling the Power Filter Units Power Cable Requirements ...
Страница 148: ...ASR 5000 Installation Guide 132 Cabling the Power Filter Units Connecting the PFU to the Power Source ...
Страница 206: ...ASR 5000 Installation Guide 190 Removing and Installing SMC PC Cards Removing PC Cards ...
Страница 212: ...ASR 5000 Installation Guide 196 Replacing the Chassis Air Filter Installing the Air Filter ...
Страница 220: ...ASR 5000 Installation Guide 204 Replacing a Power Filter Unit What to do with the Failed PFU ...
Страница 266: ...ASR 5000 Installation Guide 250 Safety Electrical and EMC Certifications Korean EMC ...
Страница 270: ...ASR 5000 Installation Guide 254 Environmental Specifications Chassis Air Flow ...
Страница 280: ...ASR 5000 Installation Guide 264 Preparing a Full Height Line Card Slot Remove the Half Height Card Guide ...
Страница 294: ...ASR 5000 Installation Guide 278 Spare Component Recommendations Spare Component Recommendations ...