12
OL-16715-01
Deploying Controller-Based Access Points
In the controller-based architecture, you can deploy up to six controller-based
AP521s and configure them using the CCA. This procedure assumes that you
are using a UC500, a CE520, a WLC526, and the CCA.
Refer to the
Cisco Smart Business Communications System Setup
document,
Section 4, ”Deploy Advanced Wireless,” and follow the steps listed there.
Note
Before you can deploy controller-based AP521s, you must first
configure the WLC526. See the
Quick Start Guide: Cisco 526 Series
Wireless Express Mobility Controller
for instructions.
Mounting the Access Point
The AP521 can be mounted as follows:
•
On a horizontal or vertical surface
•
On a suspended ceiling
•
Above a suspended ceiling
•
On a network cable box
•
On a desktop