2-4
Cisco Integrated Services Router Hardware Installation Guide
Chapter 2 Installing the Router
Installing the Cisco 810 ISR
Figure 2-2
6-32 Screws
Step 3
Connect the supplied plenum rated Cat5 cable to the GE0 port on the PoE+ splitter.
Step 4
Connect the Cat5 cable from your PoE+ source to the PoE+ in port on the PoE+ splitter.
Step 5
Place the power cord lock onto the power cord behind the connector overmold as shown in
Slide the power cord lock forward so that it captures the overmold and is fully seated.
Figure 2-3
Placement of the Power Cord Lock onto the Power Cord
285668
1
2
3
4
1
6-32 screws
3
To PoE+ power source
2
Power cable with power cord lock installed
4
GE CAT5 cable
345076
1
2
1
Power cord connector
2
Power cord lock