
Step 2
Provide power to the device:
• Base station with PoE on the LAN: Additional power is not required.
• Base station without PoE: Plug the power adapter into the base station and route the cable through the
slot in the base station.
• Repeater: Plug the power adapter into the repeater and route the cable through the slot in the repeater.
Step 3
Slide the stand into the device and press it until it clicks into place.
This graphic shows the stand connection to the base station. The back of the repeater is similar to the base
station.
Step 4
Base station only: Plug the Ethernet cable into the LAN port.
Step 5
If required, plug the power adapter into the electrical outlet.
What to do next
Do one of these:
• Base station installation:
• Manual configuration:
Sign in to the Administration Web Page, on page 42
and
• Automatic configuration:
Sign in to the Administration Web Page, on page 42
and
• Repeater installation:
Mount the Base Station or Repeater on the Wall
You can mount the base station or repeater on a wall. You put two screws into the wall and slip the base
station or repeater onto the screw heads or you can use the ceiling mount bracket.
Cisco IP DECT 6800 Series Administration Guide
31
Hardware Installation
Mount the Base Station or Repeater on the Wall
Содержание 6823
Страница 48: ...Cisco IP DECT 6800 Series Administration Guide 40 Hardware Installation Charge the Handset Battery ...
Страница 170: ...Cisco IP DECT 6800 Series Administration Guide 162 Maintenance Base Station States ...
Страница 184: ...Cisco IP DECT 6800 Series Administration Guide 176 Troubleshooting Generate PCAP Logs ...
Страница 194: ...Cisco IP DECT 6800 Series Administration Guide 186 Worksheets Handset Configuration Parameters Worksheet ...