Chapter 2 Site Planning
Site Planning Checklist
2-10
Catalyst 4900 Series Switch Installation Guide
78-18039-02
Table 2-2
Site Planning Checklist
Task No.
Planning Activity
Verified By
Time
Date
1
Space evaluation:
Space and layout
Floor covering
Shock and vibration
Lighting
Maintenance access
2
Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow
3
Power evaluation:
Input power type
Receptacle proximity to the equipment
Dedicated (separate) circuits for redundant power
supplies
UPS for power failures
4
Grounding evaluation:
Circuit breaker size
5
Cable and interface equipment evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)
6
EMI evaluation:
Distance limitations for signaling
Site wiring
RFI levels
Содержание 4908G-L3 - Catalyst Switch
Страница 4: ......
Страница 17: ...xvii Catalyst 4900 Series Switch Installation Guide 78 18039 02 Preface ...
Страница 18: ...Preface xviii Catalyst 4900 Series Switch Installation Guide 78 18039 02 ...
Страница 19: ...xix Catalyst 4900 Series Switch Installation Guide 78 18039 02 Preface ...
Страница 20: ...Preface xx Catalyst 4900 Series Switch Installation Guide 78 18039 02 ...
Страница 22: ...Preface xxii Catalyst 4900 Series Switch Installation Guide 78 18039 02 ...