6-23
Catalyst 2975 Switch Software Configuration Guide
OL-19720-02
Chapter 6 Managing Switch Stacks
Troubleshooting Stacks
Troubleshooting Stacks
•
Manually Disabling a Stack Port, page 6-23
•
Re-Enabling a Stack Port While Another Member Starts, page 6-23
•
Understanding the show switch stack-ports summary Output, page 6-24
•
Identifying Loopback Problems, page 6-25
•
Finding a Disconnected StackWiseStackCable, page 6-28
Manually Disabling a Stack Port
If a stack port is flapping and causing instability in the stack ring, to disable the port, enter the
switch
stack-member-number
stack port
port-number
disable
privileged EXEC command. To re-enable the
port, enter the
switch
stack-member-number
stack port
port-number
enable
command.
Note
Be careful when using the
switch
stack-member-number
stack port
port-number
disable
command.
When you disable the stack port, the stack operates at half bandwidth.
•
A stack is in the
full-ring
state when all members are connected through the stack ports and are in
the ready state.
•
The stack is in the
partial-ring
state when
–
All members are connected through the stack ports, but some all are not in the ready state.
–
Some members are not connected through the stack ports.
When you enter the
switch
stack-member-number
stack port
port-number
disable
privileged EXEC
command and
•
The stack is in the full-ring state, you can disable only one stack port. This message appears:
Enabling/disabling a stack port may cause undesired stack changes. Continue?[confirm]
•
The stack is in the partial-ring state, you cannot disable the port. This message appears:
Disabling stack port not allowed with current stack configuration.
Re-Enabling a Stack Port While Another Member Starts
Stack Port 1 on Switch 1 is connected to Port 2 on Switch 4. If Port 1 is flapping, disable Port 1 with the
switch 1 stack port 1
disable
privileged EXEC command.
While Port 1 on Switch 1 is disabled and Switch 1 is still powered on:
1.
Disconnect the stack cable between Port 1 on Switch 1 and Port 2 on Switch 4.
2.
Remove Switch 4 from the stack.
3.
Add a switch to replace Switch 4 and assign it switch-number 4.
4.
Reconnect the cable between Port 1 on Switch 1 and Port 2 on Switch 4 (the replacement switch).
5.
Re-enable the link between the switches. Enter the
switch 1 stack port 1 enable
privileged EXEC
command to enable Port 1 on Switch 1.
6.
Power on Switch 4.
Содержание 2975 - Catalyst LAN Base Switch
Страница 36: ...Contents xxxvi Catalyst 2975 Switch Software Configuration Guide OL 19720 02 ...
Страница 40: ...xxxviii Catalyst 2975 Switch Software Configuration Guide OL 19720 02 Preface ...
Страница 62: ...1 22 Catalyst 2975 Switch Software Configuration Guide OL 19720 02 Chapter 1 Overview Where to Go Next ...
Страница 398: ...13 30 Catalyst 2975 Switch Software Configuration Guide OL 19720 02 Chapter 13 Configuring VLANs Configuring VMPS ...
Страница 424: ...15 18 Catalyst 2975 Switch Software Configuration Guide OL 19720 02 Chapter 15 Configuring VTP Monitoring VTP ...
Страница 628: ...26 8 Catalyst 2975 Switch Software Configuration Guide OL 19720 02 Chapter 26 Configuring UDLD Displaying UDLD Status ...
Страница 660: ...28 8 Catalyst 2975 Switch Software Configuration Guide OL 19720 02 Chapter 28 Configuring RMON Displaying RMON Status ...
Страница 888: ...38 32 Catalyst 2975 Switch Software Configuration Guide OL 19720 02 Chapter 38 Troubleshooting Troubleshooting Tables ...