background image

3-2 Catalyst 2900 User Guide

Tools for Installation

Before rack-mounting the Catalyst 2900, confirm that your rack-mount configuration
conforms to the following criteria:

If the switch is installed in a closed or multiunit rack assembly, the ambient operating
temperature of the rack environment may be higher than the ambient room temperature.
The ambient temperature of the rack environment must not exceed a maximum
temperature of 104F (40C).

Airflow around the rack must be sufficient to maintain proper cooling of the switch.

Caution

Before you mount the switch in a rack, make sure of the following: the rack is

secure and in no danger of falling over; the area around the rack does not exceed a
maximum ambient temperature of 104F (40C); suf ficient airflow exists around the rack.

Warning

Two people are required to lift the chassis. Grasp the chassis underneath the

lower edge and lift with both hands. To prevent injury, keep your back straight and lift with
your legs, not your back. To prevent damage to the chassis and components, never attempt
to lift the chassis with the handles on the power supplies or on the interface processors, or
by the plastic panels on the front of the chassis. These handles were not designed to support
the weight of the chassis.

Install the switch in the rack to ensure that heavier equipment is at the bottom of the rack
to maintain a low center of gravity and prevent the rack from becoming top-heavy and
tipping over.

Refer to the section “Lifting the Chassis Safely” in the chapter “Installation Overview.”

Tools for Installation

The following are tools and equipment you will need to install the chassis:

Number 1 and number 2 Phillips screwdrivers to tighten the captive installation screws
on most systems

3/16-inch flat-blade screwdriver for the captive installation screws on the supervisor
engine module and switch modules in some systems

Содержание 2900 - Catalyst Expansion Module

Страница 1: ...lectricity in the chapter Installation Overview to familiarize yourself with the proper site and environmental conditions Failure to read and follow these guidelines could lead to an unsuccessful installation and possible damage to the system and components Rack Mounting the Switch Use the following procedure for attaching the rack mount kit and installing the switch in a wiring closet rack Two or...

Страница 2: ...p the chassis underneath the lower edge and lift with both hands To prevent injury keep your back straight and lift with your legs not your back To prevent damage to the chassis and components never attempt to lift the chassis with the handles on the power supplies or on the interface processors or by the plastic panels on the front of the chassis These handles were not designed to support the wei...

Страница 3: ...the length of one of the rear posts If your rack has this feature consider the position of the strip when planning fastener points and before you install the L brackets on the chassis determine whether you will install the chassis from the front or the rear of the rack Take the following steps to attach the two L brackets to the switch chassis Step 1 Place the chassis on the floor or on a sturdy t...

Страница 4: ...racket Quantity Part Description Received 2 L brackets left and right 12 M4 Phillips countersunk head screws 6 12 24 x 3 4 inch Phillips binder head screws 6 10 32 x 3 4 inch slotted binder head screws H1343a DTE DCE H6394 STATUS CONSOLE 10 0M bp s LI NK 10 100Mbps FAST ETHERNET SWITCHING SUPERVISOR ENGINE SYSTEM STATUS 10 0M bp s LI NK 1 10 0M bp s LI NK 1 10 0 RESET FAN PS SW IT CH LO AD 3 2 10 ...

Страница 5: ...nd lift with your legs not your back To prevent damage to the chassis and components never attempt to lift the chassis with the handles on the power supplies or on the interface processors or by the plastic panels on the front of the chassis These handles were not designed to support the weight of the chassis To see translated versions of this warning refer to the appendix Translated Safety Warnin...

Страница 6: ...vel Step 5 Make sure that your path to the rack is unobstructed Warning Use your tape measure and level to ensure that the chassis is installed straight and level To prevent bodily injury when mounting or servicing this unit in a rack you must take special precautions to ensure that the system remains stable The following guidelines are provided to ensure your safety This unit should be mounted at...

Страница 7: ...SWITCHING SUPERVISOR ENGINE SYSTE M STA TU S 10 0M bp s LI NK 1 10 0M bp s LI NK 1 10 0 RE SE T FA N PS SW IT CH LO AD 3 2 10 0M bp s LI NK 4 10 0M bp s LI NK 5 10 0M bp s LI NK 6 10 0M bp s LI NK M DI X M DI X M II M II M DI X 10 0 M bp s LI NK PORT 1 10 0 M bp s LI NK 7 PORT 2 10 0M bp s LI NK 8 10 0M bp s LI NK 9 10 0M bp s LI NK 10 10 0M bp s LI NK 11 10 0M bp s LI NK 12 ...

Страница 8: ...3 8 Catalyst 2900 User Guide Installing the Chassis in the Rack ...

Отзывы: