2-18
Cisco AC/DC Power System User Guide, R1.0
May 2006
Chapter 2 System Installation
2.4 Install Circuit Breakers
Figure 2-15
Removing a Rectifier Blank Faceplate
Step 8
Install additional rectifiers using the instructions in Steps
2
through
5
.
For more information on installing rectifiers in a powered system, see the
“4.2.2.2 Add Modules”
section on page 4-2
.
2.4 Install Circuit Breakers
Note
This procedure is optional for large systems.
Large systems equipped with the 1 RU Distribution Shelf require the installation of circuit breakers to
ensure proper system protection (the 1 RU Distribution Shelf is shipped with circuit breakers installed
for use in medium systems). To install circuit breakers in a large system:
Step 1
Make certain all breakers to be installed are in the OFF position (
Figure 2-16
).
124789
Содержание 124778
Страница 6: ...Contents vi Cisco AC DC Power System User Guide R1 0 May 2006 ...
Страница 10: ...Tables x Cisco AC DC Power System User Guide R1 0 May 2006 ...
Страница 28: ...1 12 Cisco AC DC Power System User Guide R1 0 May 2006 Chapter 1 Introduction 1 2 3 Electrical Safety Warnings ...
Страница 76: ...5 4 Cisco AC DC Power System User Guide R1 0 May 2006 Chapter 5 System Troubleshooting ...
Страница 78: ...6 2 Cisco AC DC Power System User Guide R1 0 May 2006 Chapter 6 System Parts List ...
Страница 86: ...A 8 Cisco AC DC Power System User Guide R1 0 May 2006 Appendix A Translated Safety Warnings ...
Страница 96: ...A 18 Cisco AC DC Power System User Guide R1 0 May 2006 Appendix A Translated Safety Warnings ...