background image

The screen has a nine-foot power cable permanently attached to the left side of the screen as seen from the 
viewing area. Install or locate a receptacle close enough to plug the screen in prior to installation. 

                                                                                                                                                                      

 

 

 

                                                                                                                                                                                                            

 

 

 

 

4.1 Prepare Frame Sections for Assembly 

A.

 

Retention springs are pre-assembled. Please confirm based on quantity noted on frame label for the 
short and long frame sections.  
i.

 

The hook on the spring must be nearest the inside frame edge.  

B.

 

Sliding nuts are pre-installed into frames, 16 total. Sliding nuts are used to install the thin bezel caps, 
center stabilizing bar, and wall brackets. Please ensure all 16 sliding nuts are on the frames prior to 
installing and tightening the corner brackets.  

C.

 

Install the corner brackets to the top and bottom slots of the short frame section.  
i.

 

The small bracket goes in the bottom slot, and the large one goes in the top slot.  

 

 

 

 

 

 

 

 

 

 

As you unpack the projection screen: 

 

Remove all accessories from the box before discarding any packaging. Use the Package Contents section to 
verify that everything has been removed.  

 

After the screen is removed from the package, please check for transport screws which may be present 
holding the batten bar to the casing. Be sure to remove the screws holding the bottom rail of the screen in 
the housing. 

Содержание Nero G4

Страница 1: ...Ambient Light Reflecting Thin Bezel Fixed Frame Projection Screen ...

Страница 2: ...ny damage 3 When installing the screen material onto the frame make sure it is facing forward 4 Be careful not to scratch or damage the screen surface while handling it 5 Do not write or draw on screen surface Do not poke fold or tear screen material 6 Do not use detergents or harsh chemicals to clean screen material A soft cloth can clean dust and dirt off frame 7 Cover the screen to block out di...

Страница 3: ... Electric or Cordless Drill Level Pencil Screwdriver Ladder Carpenter s square Measuring tape Stud finder ...

Страница 4: ...e thin bezel caps center stabilizing bar and wall brackets Please ensure all 16 sliding nuts are on the frames prior to installing and tightening the corner brackets C Install the corner brackets to the top and bottom slots of the short frame section i The small bracket goes in the bottom slot and the large one goes in the top slot As you unpack the projection screen Remove all accessories from th...

Страница 5: ...tighten to hold the frame together C Hand tighten all four screws ensure the corners are square then tighten the screws completely D Lift up and set aside to prepare screen material for assembly 4 3 Prepare the Screen Material A Lay the frame down onto the screen material ensuring the corners of the frame and the screen material are properly aligned as shown below ...

Страница 6: ...remain springs making sure t keep the spring tension balanced 4 5 Install Brackets and Frame Bezels A Install the center support bar to the frame using the sliding nuts installed in the centers of the long sides of the frame B Turn the frame over and slide the long frame bezels onto the long sides of the frame and the short sides onto the short sides of the frame C Install the bezel brackets to se...

Страница 7: ...op frame using the M5 x 6mm screws The brackets should just be able to slide left and right C Loosely secure the circular metal half of the magnets to the lower frame do not tighten the screws completely the brackets should just be able to slide left and right 4 7 Hang the Screen A Measure the overall length and height of the screen frame B For Drywall Drill 4 holes in the wall at the desired heig...

Страница 8: ... hang the screen Install the lower 2 magnets pieces using 2 M5 x 40mm screws Hang the screen on the upper brackets and attach the lower part of the frame to the wall with the magnets 5 Cleaning the Projection Screen 6 Troubleshooting Initially there may be some wrinkles in the screen If there are do not worry Let the screen sit for a few days and the wrinkles will most likely come out on their own...

Страница 9: ......

Страница 10: ......

Отзывы: