The screen has a nine-foot power cable permanently attached to the left side of the screen as seen from the
viewing area. Install or locate a receptacle close enough to plug the screen in prior to installation.
4.1 Prepare Frame Sections for Assembly
A.
Retention springs are pre-assembled. Please confirm based on quantity noted on frame label for the
short and long frame sections.
i.
The hook on the spring must be nearest the inside frame edge.
B.
Sliding nuts are pre-installed into frames, 16 total. Sliding nuts are used to install the thin bezel caps,
center stabilizing bar, and wall brackets. Please ensure all 16 sliding nuts are on the frames prior to
installing and tightening the corner brackets.
C.
Install the corner brackets to the top and bottom slots of the short frame section.
i.
The small bracket goes in the bottom slot, and the large one goes in the top slot.
As you unpack the projection screen:
•
Remove all accessories from the box before discarding any packaging. Use the Package Contents section to
verify that everything has been removed.
•
After the screen is removed from the package, please check for transport screws which may be present
holding the batten bar to the casing. Be sure to remove the screws holding the bottom rail of the screen in
the housing.
Содержание Nero G4
Страница 1: ...Ambient Light Reflecting Thin Bezel Fixed Frame Projection Screen ...
Страница 9: ......
Страница 10: ......