6�11�-
MAXIMUM DEMAND INTEGRATION PERIOD
The maximum demand integration period is programmed in minutes on this screen. See
Press key
for 3 seconds to edit the value. The
icon appears at the top of the screen.
To enter or modify the value, press the
key repeatedly, increasing the value of the flashing digit.
When the desired value is shown on the screen, move onto the next digit by pressing the key
to
modify the other values.
To validate the data, press
for 3 seconds and the
icon will disappear from the display.
The programmed value will be deleted if the entered value is higher than the maximum programming
value.
Configuration values
Table 27:Configuration values: Maximum demand integration period�
Maximum demand integration period
Minimum value
0
Maximum value
60
Note:
Programming the value
0
disables the calculation of the maximum demand.
Note:
When modifying the integration period, the device restarts the calculation of the maximum
demand.
Press key
to access the next programming step.
45
Instruction Manual
CVM-C11
Содержание CVM-C11
Страница 1: ...INSTRUCTION MANUAL M361B01 03 22A Power analyzer CVM C11...
Страница 2: ...2 CVM C11 Instruction Manual...
Страница 94: ...11 EU DECLARATION OF CONFORMITY 94 CVM C11 Instruction Manual...
Страница 95: ...95 Instruction Manual CVM C11...
Страница 96: ...96 CVM C11 Instruction Manual...