MC75i Hardware Interface Description
3.3 Power Up / Power Down Scenarios
71
MC75i_HD_v01.100a
Page 29 of 122
2009-08-13
Confidential / Released
Figure 6:
Powerup with IGT held low before switching on operating voltage at BATT+
For details on how to use EMERG_OFF to reset ap-
plications or external devices see
.