- 21 -
Sealing Procedure
Diagram 1
C
D
B
A
F
SEALING HOSE
HOSE BOOM
ACCESS PORT
1)
Turn wand valve (F) "off" and remove the wand from the access port until you can see
the sealing tip.
2)
Open wand valve to the full "on" position and observe the material as it flows into the
tank through the access port.
3)
Adjust the pressure valve (B) until the flow rate appears to be correct for the size crack
or joint to be filled.
4)
Turn the wand valve "off" and proceed to the crack or joint to be filled.
5)
Place the sealing tip into the joint, open the wand valve to the full "on" position and
begin sealing by dragging tip through the joint.
6)
If the flow rate is incorrect, repeat steps 1 through 3 until the desired flow is achieved.
7)
As you approach the end of the joint, turn the wand valve "off" to avoid excess spillage.
8)
To avoid material freezing in the hose, always return the wand to the access port and
open the wand valve to allow material to circulate through the hose.
NOTE: On units equipped with the electrically heated hose option, the wand can be
placed into the wand holder (G) instead of the access port. However, If the
hose will not be used for an extended period, it is recommended that it be
placed in the access port and the valve opened. This will extend the life of the
hose because the material is being agitated instead of sitting in the heated
hose.
G
Содержание 105
Страница 43: ... 43 Hydraulic Schematic B2 A2 A1 B1 MD1 MD2 G2 R2 CS1 093 1500PSI R1 P T Model 105 1100 PSI Model 225 800 PSI ...
Страница 49: ... 49 Wiring Diagrams Complete Wiring Diagram No Heated Hose OilThermocouple Material Thermocouple ...
Страница 67: ... 67 6 11 12 1 7 10 5 3 4 2 13 9 Miscellaneous Parts ...
Страница 70: ... 70 Notes ...
Страница 72: ...2601 Niagara Lane Plymouth MN 55447 763 557 1982 800 328 3874 Fax 763 557 1971 ...