background image

ONT G-25E Hardware Installation Manual

 

 

LED Name  Color 

Indicates 

Green/Solid 

ONT operating from AC power. 

Green/Quick Flash  System Booting. 

POWER 

ONT operating from battery power (applicable 
only for ONT equipped with UPS power 
interface). 

Green/Flash 

Red/Solid 

Optical interface abnormal (LOS/LOF). 

Green/Solid 

ONT working normally. 

OPTICAL 

Green/Flash 

ONT in ranging and synchronization process. 

At least one of the Ethernet links at the ONT is 
up. 

Green/Solid 

At least one of the Ethernet links at the ONT is 
up and there is activity of receiving and 
transmitting data. 

Green/Flash 

LAN 

OFF 

No Ethernet link is up at the ONT or the ONT 
is not ready for running Ethernet service. 

Green/Flash In 

upgrading. 

Red/Solid Upgrade 

failure. 

UPGRADE 

OFF 

ONT working normally. 

Green/Solid 

No alarm with local access enabled 

Red/Flash 

Software out of order. 

Red/Solid 

Hardware out of order. 

ALARM 

OFF No 

alarm. 

At least one POTS interfaces is in off-hook 
condition. 

Green/Solid 

At least one POTS interfaces is in off-hook 
condition for at least one hour. 

Green/Flash 

POTS 

All POTS interfaces are in the on-hook 
condition  or the ONT is not ready for running 
POTS service. 

OFF 

Table 8 ONT Status LEDs description 

 

313-12201-02 Rev. B: August 2007 

Cambridge Industries Group Co. Ltd 

12

 

Содержание G-25E

Страница 1: ...CAMBRIDGE Industries Group Co Ltd ONT G 25E Hardware Installation Manual August 2007 313 12201 02 Rev B www cambridgeig com CIG CAMBRIDGE Industries Group Co Ltd CIG...

Страница 2: ...oprietary information belonging to CIG and may not be used or disclosed except in accordance with applicable agreements Performance figures and data quoted in this document are typical and must be spe...

Страница 3: ...ng PRC Phone 852 2827 1778 Shanghai Building 4 3 F Block D 889 Yishan Road Shanghai 200233 China Phone 86 21 6121 3299 Fax 86 21 6121 3277 Email info cambridgeig com Web URL http www cambridgeig com O...

Страница 4: ...one Delays caused by e mail may result in a longer response time Telephone 86 21 6121 3299 Email support cambridgeig com When you contact CIG please have the following information ready z Product mode...

Страница 5: ...bility EMC Part 4 testing and measurement techniques section 2 electrostatic discharge immunity test EN 61000 4 3 2002 A1 2002 Electromagnetic Compatibility EMC Part 4 testing and measurement techniqu...

Страница 6: ...llation ________________________________________________________________ 6 3 1 Site Preparation _______________________________________________________________ 6 3 1 1 Environmental Requirements _____...

Страница 7: ...uction to the ONT including physical electrical environmental and optical specifications Compliance information is also provided Chapter 2 Safety Provides electrical electrostatic and laser safety inf...

Страница 8: ...ternet access and IPTV VOD services z Two POTS VoIP service ports for voice services ONT G 25E has built in capability for remote management like supervision monitoring and maintenance 1 3 Features Th...

Страница 9: ...ble 1 Physical specification Input Power 12V DC power input Power Supply AC power supply with included power adapter Power Consumption 7 5W Table 2 Electrical specification Temperature 0 40 C Humidity...

Страница 10: ...310 nm 1360 nm Transmit power 0 5 dBm 5 dBm Digital receiver Wavelength 1480 nm 1490 nm 1500 nm Minimum received power for BER 10 10 Sensitivity 27 dBm Overload 8 dBm Maximum received power for BER 10...

Страница 11: ...urce for the system is adequately rated to assure safe operation and provides current overload protection z Do not allow anything to rest on the power cable and do not place this product where people...

Страница 12: ...nds of un terminated fiber cables or connectors Never look directly into an un terminated cable or connector This ONT uses a class I laser device DANGER Personnel handling fiber optic cables must be t...

Страница 13: ...ication printed on the power adaptor input voltage current etc CAUTION Please use the power adaptor within the package only or the replacement unit that provided by CIG Other power adaptor may cause d...

Страница 14: ...ow Figure 5 Figure 5 Connect to network final view 3 3 Connecting Power 1 Plug the circle two pin 12V DC power connector of power converter to ONT power port 2 Plug the input of power converter into a...

Страница 15: ...phone Using the wire pair from to the PSTN network falsely may cause damage to user and the device 3 5 Connecting Ethernet Service 1 Locate the premises Ethernet LAN cable 2 If the cable is not termin...

Страница 16: ...already been provisioned in the network the OPTICAL LED lights green after the ONT boot sequence and PON ranging process is complete approximately 1 minute after power up During that ranging process...

Страница 17: ...1 Connect to each active phone jack to verify telephone numbers and services Verify that the POTS LED lights green when a line is off hook 2 If Ethernet service is included in this installation confir...

Страница 18: ...Status LEDs The ONT status LEDs located on the enclosure Figure 8 assist with installation and maintenance procedures These LEDs are described in detail in Table 8 Figure 8 ONT Status LEDs location 31...

Страница 19: ...y of receiving and transmitting data Green Flash LAN OFF No Ethernet link is up at the ONT or the ONT is not ready for running Ethernet service Green Flash In upgrading Red Solid Upgrade failure UPGRA...

Страница 20: ...solid Reset the ONT by reset button If the ONT fails again replace the unit This is normal at boot up and may take up to 1 minute to turn green If this state persists contact the NOC Network Operatio...

Отзывы: