4
CHRISTIE DIGITAL SYSTEMS
4-1
August 7, 2003
4 . I N S T A L L A T I O N
P R O C E D U R E S
4.1. U
N P A C K I N G
Follow these instructions if the unit is crated.
Christie recommends that the unit be moved to the installation site before
uncrating.
1. Be sure container is upright.
2. Open crate and remove packing.
3. Carefully remove unit from crate.
4. Thoroughly inspect unpacked unit for damage that may have occurred during shipping.
Any damage discovered should be reported to the transportation company at
once for inspection and filing of claim.
4.2. I
N S T A L L A T I O N
Place console in intended operating location in projection booth.
4 . 2 . 1 . L
E V E L I N G
F
E E T
Install four (4) leveling feet by screwing one into each of the four corners underneath base
until about 1/2 inch of thread remains exposed. (See Item 8 in Figure 4-1.)
Christie recommends carefully
tilting the console to one side to install the
first two feet, then tilting it to the other side to install the other two feet.
An assistant is required to do this safely.
Содержание SLC 20
Страница 6: ......
Страница 12: ......
Страница 14: ......
Страница 24: ......
Страница 30: ...SLC Series Xenon Console 6 6 CHRISTIE DIGITAL SYSTEMS August 7 2003 ...
Страница 40: ...SLC Series Xenon Console W 2 CHRISTIE DIGITAL SYSTEMS August 7 2003 ...
Страница 42: ...SLC Series Xenon Console A 2 CHRISTIE DIGITAL SYSTEMS August 7 2003 Figure A 1 Autofocus Assembly ...
Страница 52: ...SLC Series Xenon Console A 12 CHRISTIE DIGITAL SYSTEMS August 7 2003 Figure A 6 Plenum All Models Top View ...
Страница 54: ...SLC Series Xenon Console A 14 CHRISTIE DIGITAL SYSTEMS August 7 2003 Figure A 7 Power Supply ...
Страница 56: ......
Страница 60: ......
Страница 61: ......