6. Re-attach the terminal block cover using the two cover screws.
7. Plug the power cable into an appropriately rated AC power outlet.
Connecting the coolant lines
The required coolant lines and hose accessories are available in the Christie Chiller Setup Kit (P/N:
163-127101-XX).
•
Make sure the coolant lines connecting the projector and chiller are installed at floor level.
Installing the coolant lines at a higher elevation, such as across a ceiling, can result in a
backflow through the lines and an overflow of the chiller reservoir. If your site requires
installation on different levels, contact Christie technical support for further information.
•
In dual projector installations, verify that the chiller communication cables are connected
correctly between each projector-chiller pair and that the cables are not cross-connected relative
to the coolant lines.
1. Position the chiller.
2. Install the required hose accessories on the chiller inlet and outlet ports, including:
•
inlet hose from the chiller inlet port to the chiller filter
•
hose and elbow fitting at the filter inlet
•
outlet hose and elbow fitting at the chiller outlet port
The inlet filter and hose barbs required for the chiller are pre-installed.
Installing and setting up
C RGB PLF Installation and Setup Guide–CP4450-RGB
34
020-103072-02 Rev. 1 (09-2019)
Copyright
©
2019 Christie Digital Systems USA, Inc. All rights reserved.
Содержание CineLife+ RGB PLF CP4450-RGB
Страница 1: ...Installation and Setup Guide 020 103072 02 CineLife RGB PLF CP4450 RGB...
Страница 61: ......