background image

13. Connect the harness to the new board.
14. Using the locating pins, position the PCB on the housing and reinstall the three cap screws.

Do not over-torque the screws.

15. Route the harness through the housing clip.

16. Install the new housing in the same position as the previous housing.

It may be necessary to use a flashlight to see the screw locations.

17. Perform a DAC and Color sensor color calibration.

Calibration of the color sensor board must be completed after replacing the LOS or the color
sensor board. When replacing the LOS, only the Color sensor color calibration is required.

18. Reinstall the color sensor cover removed in step 5.
19. Reinstall the bottom cover.

Removing the coupling elbow mirror assembly

1. Remove the card cage (on page 4).
2. Remove the four screws securing the mirror.
3. Rotate the four spring clips clear of the mirror.
4. Replace the mirror assembly.
5. To re-install, follow these steps in reverse order.
6. After re-installing the assembly, perform optical adjustments and software calibration.

Removing the card cage

The card cage contains the slots for the F-Main electronics card.

1. Remove the top cover.
2. Remove the electronics-side cover.
3. Disconnect all external card cage connections and any input sources.
4. Using a 3 mm driver, remove the two screws securing the electronics bracket and remove

bracket.

Upgrading the color sensor board

Upgrading the Color Sensor Board Instruction Sheet

4

020-103100-01 Rev. 1 (06-2019)

Copyright 

©

 2019 Christie Digital Systems USA, Inc. All rights reserved.

Содержание 4K40-RGB Series

Страница 1: ...eries projectors Required tools and parts Before replacing components in the projector ensure the following tools and parts are available Color sensor board and housing upgrade kit P N 003 006740 XX 2...

Страница 2: ...ector of approximately 12 cm or 4 in Alternatively tip the projector so it is resting on its side Before performing the upgrade procedure on a CP4325 RGB projector consider inverting the projector ont...

Страница 3: ...ce of the legacy fold mirror is silver reflective on both sides while the surface of the new fold mirror is silver reflective on one side and black with a pin sized through hole to allow partial light...

Страница 4: ...bottom cover Removing the coupling elbow mirror assembly 1 Remove the card cage on page 4 2 Remove the four screws securing the mirror 3 Rotate the four spring clips clear of the mirror 4 Replace the...

Страница 5: ...J5 J7 J87 from the SSCB on top of the card cage 7 Disconnect the two harnesses J17 J18 from the backplane board 8 Loosen the four captive screws securing the card cage Upgrading the color sensor board...

Страница 6: ...ear appropriate gloves when servicing any optical surfaces Supplies for cleaning optical surfaces Soft camel hair brush Dust free blower Filtered dry nitrogen blown through an anti static nozzle Dust...

Страница 7: ...nsor board harness from routing clips starting near the HKBB and finishing at the P clip fastened to the base plate in front of the IOS 6 Gently pull the harness out from underneath the IOS Take care...

Страница 8: ...ll all modules and covers previously removed Performing the DAC calibration Calibrate the black levels for the new color sensor board 1 Enable direct communication to photon controller a Set the IP ad...

Страница 9: ...g laser and MCGD files 4 Login to the projector with Installer access or higher 5 Navigate to the laser power settings page 6 Set the following values LiteLOC is disabled Maximum Expected Room tempera...

Страница 10: ...g CAL FANS 5 45 proj sendstring CAL FANS 6 45 proj sendstring CAL FANS 7 45 proj sendstring CAL FANS 8 45 proj sendstring CAL FANS 9 45 proj sendstring CAL FANS 10 45 proj sendstring CAL FANS 11 45 pr...

Страница 11: ...opulates line 96 on the calculator The temperature values reported in NetTerminal must be divided by 100 before being entered on line 27 and Line 63 27 Type the command on line 96 of the spreadsheet i...

Отзывы: