7. Install the new color sensor board harness (P/N: 001-113506-02) starting near the HKBB,
routing through all routing clips and finishing at the lowest P-clip.
8. Gently route the color sensor board harness under the IOS and pull it into position at the
underside of the projector.
9. Connect the harness to the color sensor board.
10. Reinstall the color sensor board PCB.
11. Reinstall all modules and covers previously-removed.
Performing the DAC calibration
Calibrate the black levels for the new color sensor board.
1. Enable direct communication to photon controller.
a) Set the IP address of the projector and the IP address of the laptop to be on the same
subnet.
This connection can be a direct connection to the management port on the FMAIN through
Wired/wireless network.
Upgrading the color sensor board
Upgrading the Color Sensor Board Instruction Sheet
8
020-103100-01 Rev. 1 (06-2019)
Copyright
©
2019 Christie Digital Systems USA, Inc. All rights reserved.