Freeze-dryer Beta 1-8 LSCplus
Freeze-dryer Beta 2-8 LSCplus
6 Operation
50 / 125
Version 04/2013, Rev. 2.9 of 09/03/2020
• sb-dc
Translation of the original operating manual
Fig. 24
: Dialog box “Pressure increase test”
• The "Test stop" button stops the pressure increase test.
Dialog box "Schematic system diagram" (6)
Pressing the button "Schematic system diagram" displays a schematic
diagram of the system on the left-hand side of the screen, including all the
components. Active components are displayed in green. Touching a
component calls up its name and
→
reference designator
.
Fig. 25: Schematic system diagram with the name and reference designator of the
component