![Chloride SYNTHESIS Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/chloride/synthesis/synthesis_user-manual_2602774028.webp)
1.7.1.3 CONFIGURING THE UPS FOR A DUAL FEED INPUT.
The UPS can easily be configured in the field for a dual feed input.
L1
L2
L7
L8
L3
N
L4
L5
L6
_
+
JUMPERS
BYPASS
UTILITY
LOADS
EXTERNAL
BATTERIES
Figure S: Configuring the dual feed option (14-18kVA)
Removing the two jumpers shown in
Figure S
allows the UPS bypass line to be fed by a
separate source. Connect the source that is to supply the Bypass and the Maintenance
Bypass to L1 and L2. The source that is to supply the rectifier, the main input, is to be
connected to L7 and L8. Refer to
Figure S
above for these connection locations.
28