To correctly install the unit, please follow the procedure described below:
1.Connect the load (i.e. PC CPU, Monitor) to the UPS Battery Protected outlets. Appropriate loads are
those units that will require extend run time during blackouts.
2. Connect the selected load (i.e. printer, scanner) to the surge protected outlet. Appropriate loads are
those elements that demand surge protection, but that do not require extended runtime during
power outages.
3. If the UPS will provide communication to a computing system, connect the comms cable to the
UPS comm port and to the PC serial port
Operating manual
14
945014.066
REV: 17/04/01
UK
Содержание Desk POWER 300
Страница 1: ......
Страница 2: ......
Страница 6: ...6 945014 066 REV 17 04 01 ...
Страница 8: ...Operating manual 8 945014 066 REV 17 04 01 UK ...
Страница 28: ......
Страница 30: ...Bedienungsanleitung 30 945014 066 REV 17 04 01 D ...
Страница 50: ......
Страница 52: ...Manual de usuario 52 945014 066 REV 17 04 01 E ...
Страница 72: ......
Страница 74: ...Manuel utilisateur 74 945014 066 REV 17 04 01 F ...
Страница 94: ......
Страница 96: ...Manuale d Uso 96 945014 066 REV 17 04 01 I ...
Страница 116: ......
Страница 118: ...Manual de instruçöes 118 945014 066 REV 17 04 01 P ...
Страница 138: ......
Страница 141: ......
Страница 142: ......
Страница 143: ......
Страница 144: ...CHLORIDE POWER PROTECTION www chloridepower com ...