32
OPERATIONAL PROCEEDURES
STARTUP PROCEDURE
1.
With main disconnect off, switch SW1 to position 3 and CB1 off.
2.
Turn main disconnect on. (Supplies load)
3.
Turn CB1 on.
4.
Close F1 and F2.
5.
Turn SW1 to position 2.
6.
Check for fault codes.
7.
Press interlock pin and turn SW1 to position 1.
8.
Press the “INVERTER ON” button for 3 seconds on the front panel.
MAINTENANCE BY-PASS PROCEDURE
1.
Press “INVERTER OFF” for 3 seconds or until the audible alarm is heard and Inverter mimic shows off.
2.
Switch SW1 to position 2 and then to position 3.
3.
Turn off CB1.
4.
Open F1 and F2.
SHUTDOWN PROCEDURE
1.
Press “INVERTER OFF” for 3 seconds or until beep is heard or inverter turns off.
2.
Switch SW1 to position 2 and then to position 3.
3.
Turn off CB1.
4.
Open F1 and F2.
5.
Turn off main disconnect (and By-pass, if required)
Содержание CP3000 Series
Страница 22: ...13 UPS Top Plate template ...
Страница 23: ...14 UPS Bottom Plate template ...
Страница 27: ...18 Figure 9 GCAB ...
Страница 28: ...19 Battery Cabinet Conduit Plate Template ...
Страница 32: ...23 Menu Structure ...
Страница 49: ...40 INDUSTRIAL CONTACT CARD Figure 18 Industrial Contact Card and Bracket The contacts are rated at 120V 2A ...