
NXZ Automatic Transfer Switch
02
The installation, operation and maintenance of the product are only carried out by
qualified professional.
Double switch off position
①
②
Normal switch on position
Standby switch on position
③
④
Manual debugging
Power -on test
Setting state mode
Start-up mode of generator
Move the orange
button to the
operating
position
Automatic mode
+
-
+
-
SET
+
-
AUTO
GENERATCR
AUTO
on
on
OFF
SET
ON
OFF
AUTO
MANU
I
II
I
II
on
on
OFF
SET
ON
OFF
AUTO
MANU
I
II
I
II
on
on
OFF
SET
AUTO
MANU
I
II
Figure 2
Manual debugging
Figure 3-1
Power -on test