1.  Introduction

1.1 Purpose

This document provides detailed instructions and valuable safety information regarding the installation, electrical connection, 
and maintenance of the following ASTRONERGY Crystalline Photovoltaic modules:

CHSM5409M

CHSM5612M

CHSM5612M (BL)

CHSM5612M (FR)

CHSM6608M

CHSM6610M

CHSM6610M (BL)

CHSM6610M (FR)

CHSM6610P

CHSM6612P

CHSM6610P (BL)

CHSM6610P (BF)

CHSM6610P (FR)

All instructions and mechanical and electrical requirements should be read and understood before attempting installation. 
The installer should conform to all safety precautions in this guide when installing the module. Keep this guide in a safe place 
for further reference.

1.2 

Limitation of Liability

Because the use of this manual and the conditions or methods of installation, operation, use and maintenance of photovoltaic 
(PV) products are beyond Astronergy’s control, Astronergy does not accept responsibility and expressly disclaims liability 
for loss, damage, or expense arising out of or in any way connected with such installation, operation, use or maintenance. 
Astronergy reserves the right to change the manual without prior notice.

2.  Safety

2.1 

General Safety

2.1.1 

Consult and follow local codes and other applicable laws concerning required permitting as well as installation & 

                 inspection requirements, rules, and regulations.
2.1.2 

PV modules should be installed and maintained by qualified personnel.

2.1.3 

Use the same performance modules within a given series.

2.1.4 

Follow all safety precautions of all components used in the system.

2.1.5 

Do not shade portions of the PV module surface from the sun for a long period of time. The shaded cell may become   

                 hot (hot spot phenomenon), which can result in solder joints peeling off.
2.1.6 

Do not clean the glass surface with chemicals.

2.1.7 

Do not drop the PV module or drop objects onto the PV module.

2.1.8 

Do not concentrate sunlight on the modules or panels.

2.1.9 

Do not attempt to disassemble the modules, and do not remove any attached components from the modules.

2.1.10  Do not scratch or hit at the back sheet, the glass, the terminal box. Do not pull the cables or touch them with 
                 bare hands.
2.1.11  Do not drill holes in the frame or scratch the insulating coating of the frame.

Содержание Astronergy CHSM6610M

Страница 1: ...THE POWER OF ASTRONERGY CRYSTALLINE SILICON PV MODULE INSTALLATION GUIDE ...

Страница 2: ...n 2 Safety 3 Mechanical Installation 4 Electrical Installation 5 Maintenance and Disposal 1 1 Purpose 1 2 Limitation of Liability 2 1 General Safety 2 2 Installation Safety 3 1 Installation Condition 3 2 Installation Methods 4 1 Installation Condition 4 2 Grounding ...

Страница 3: ... installation operation use or maintenance Astronergy reserves the right to change the manual without prior notice 2 Safety 2 1 General Safety 2 1 1 Consult and follow local codes and other applicable laws concerning required permitting as well as installation inspection requirements rules and regulations 2 1 2 PV modules should be installed and maintained by qualified personnel 2 1 3 Use the same...

Страница 4: ... inverters etc 2 2 12 Do not expose wires to direct sunlight Use UV resistant cabling 2 2 13 Do not damage the surrounding PV modules or mounting structure when replacing a PV module 2 2 14 Do not change any PV module components diode junction box plug connectors etc 2 2 15 Maximum reverse current is 13 5A for module with 5 inch cells and 20 25A for module with 6 inch cells Use a blocking diode an...

Страница 5: ...7x11 5mm in the frame according tothe Fig a b For maximum security against strong winds and heavy snow all available mounting holes should be used 3 Secure each bolt to the frame with 2 stainless steel washers one on each side of the mounting structure and screw on either a stainless steel spring washer or a toothed lock washer Finally secure with a stainless steel nut M6 4 The torque for tighteni...

Страница 6: ...o allow bolts to be attached to the bars at the same locations as mentioned before 4 Secure each clamp by attaching plain washer spring washer and nut in that order 5 Both of close ups of Fig g indicate the middle clamps and Fig h indicate the side clamps for your reference The dimensions for the middle clamps are a 40 mm b 26 mm c 8 mm d 28 mm and Ø 9 mm The torque for tightening the nut and bolt...

Страница 7: ...50 250 CHSM5612M BL 1580 808 35 1580 200 200 CHSM5612M FR 1580 808 35 1580 200 200 CHSM6610P FR 1652 994 35 1652 200 210 CHSM6608M 1336 994 40 1336 50 280 CHSM6610M BL 1652 994 40 1652 50 360 CHSM6610P BL BF 1652 994 40 1652 50 360 CHSM6610P FR 1652 994 40 1652 50 360 CHSM5612M 1580 808 45 1580 50 350 CHSM6610M 1652 994 45 1652 50 360 CHSM6610P 1652 994 45 1652 50 360 CHSM6612P 1956 994 45 1956 48...

Страница 8: ...the permitted maximum system voltage under the worst local temperature conditions 4 1 4 Under normal conditions a photovoltaic module is likely to experience conditions that produce more current and or voltage than reported at standard test conditions Accordingly the values of Isc and Voc marked on this module should be multiplied by a factor of 1 25 when determining component voltage ratings cond...

Страница 9: ...rndy formerly Wiley Electronics Washer Electrical Equipment Bonding WEEB and similar devices such as barbed washers that meet the requirements of UL 467 as suitable for electrical bonding and grounding PV modules to PV mounting systems 5 Maintenance 5 1 Regularly carry out a visual inspection for dirt dust bird dropping leaves and other detritus covering the modules 5 2 If there is a build up of d...

Страница 10: ... San Francisco CA 94107 USA Tel 1 650 392 2777 Japan KoyoAstro Co Ltd 1 5 6 Higashi Nihonbashi Chuo ku Tokyo 103 0004 Japan Tel 03 5820 2141 Fax 03 5820 2142 Korea Astronergy Solar Korea 5th FL Cowell Bldg 66 1 Banpo Dong Seocho Gu Korea Tel 82 0 2 2226 3911 Fax 82 0 2 2226 3910 Thailand Astronergy Solar Thailand Co Ltd 184 88 Forum Tower 18FL Ratchadapisek Rd Huay Kwang Bangkok 10320 Thailand Tel...

Отзывы: