China Honway Machinery HWG550 Скачать руководство пользователя страница 7

4

Matters need attention

Overload  of  electrical motor  (The  electrical  motor would  be  overload  in
the following condition)

The voltage of the electric is on the low side;

The protection certification of the electric motor is set inappropriate;

The motor overloads at very low speed during long time;

How to solve above problems:

Reset the V/F curved shaped and the torque data;

Check the power source;

Adjust the working load or choose another inverter which is suitable for the
capacity of electric motor;

When  low  speed  of  motor  and  long  working  time  is  needed,  choose  the
exclusive frequency conversation electric motor.

Overload  of inverter  :(  The inverter motor  would  be  overload  in  the
following condition)

Overload;

Accelerating time is too short;

When the electric motor is initiated, after a short stop;

V/F curved is set improperly or the torque data is too much;

How to solve above problems:

Change the inverter whose capacity is matching;

Prolong the accelerate time;

Renew the V/F cured shape or the torque data.

Содержание HWG550

Страница 1: ...crete grinding and polishing machine HWG550 China Honway Technology Co LTD 5bldg Changhua Park Yuelu District Changsha China Tel 0086 0731 84223603 Fax 0086 0731 84227598 Cell Phone 0086 13077380137 E...

Страница 2: ...Table of Contents Section Page No Safety Instructions 1 Handing Instruction 2 Grinding process 3 Matters need attention 4 Accessories 6 Circuit Diagram of Inverter 7...

Страница 3: ...Brief Parts Diagram...

Страница 4: ...the power you must make sure that the voltage is suitable to the voltage that machine requires Besides you should guarantee the charge of the voltage below 10 of the prescriptive voltage When the volt...

Страница 5: ...tly and let the slices keep close to the floor please put down gentle Third adjust the handlebar and put the handle to the position suitable for operation Fourth to avoid dust to cause the machine ove...

Страница 6: ...1 2 3 working as the floor steps Polishing after grinding please use the polish powder in order to make the surface look lightly For Concrete Grinding Coarse grinding you can choose the tools 16 30 8...

Страница 7: ...the working load or choose another inverter which is suitable for the capacity of electric motor When low speed of motor and long working time is needed choose the exclusive frequency conversation ele...

Страница 8: ...ion around the inverter When the power LED stops working or the light of power winking but on the screen there shows power It says that poor contact occurs When hunting of speed control occurs or the...

Страница 9: ...6 Accessories Power cord 10meters 1piece Weight iron 30kg 1piece Carring pole 2 pieces Buffing pads 2 pieces Waterproof belt 1piece...

Страница 10: ...7 Circuit Diagram of Inverter...

Отзывы: