1
Outline - F2X Assembly Instructions
Basic Information
Layout the parts, grouping by color codes. Poles are bundled in specific groups for your
convenience.
Align tubes carefully as to not cross thread. Laying on the floor or a flat surface is helpful. Do not
force if you encounter undue resistance.
Start the first bay on one side, and then complete the opposite side, working a bay at a time, adding
top perimeter tubes as you go - bay by bay.
Position all the cross tubes tabs on the same side of the uprights, either all to left of all to right
throughout, except as noted for the ends
(1)
. Slide all tabbed parts over the threads carefully.
It is recommended to pre-assemble all cross tubes, including the light support assemblies (adjusting
and locking the light tube angles
(2)
for efficiency.
Refer to the drawings for further instructions.
It is recommended to lubricate the threads occasionally with Dry Slide Teflon Powder for easier
assembly.
Swivel tube Tabs. Each cross tube, when assembled, should have a stationary tab on one end and a
swivel tab on the other end. This allows the tabs to be properly aligned during frame assembly. Tube
components that have the swivel tabs are identified by a stripe of red tape on the tab end
(3)
.
(1)
www.chimeralighting.com
1812 Valtec Lane
Boulder, Colorado 80301
Phone: (303) 444-8000
Fax: (303) 444-8303
Toll Free: (888) 444-1812