STCS5024 Full Gigabit Layer 3 switch Installation Guide
- - 8 - -
www.stephen-tele.com
Make sure that the cabinet and the workbench are well grounded.
To ensure normal operation and prolong the service life of the switch, the requirements on the installation site described in
the following sections must also be met.
3.2.1 Temperature/Humidity Requirements
To ensure the normal operation and service life of a switch, you need to maintain the temperature and the humidity of the
equipment room at a certain level. If the humidity level in the equipment room is too high for a long time, it will lead to bad
insulation of the insulating material or even leakage. Sometimes, the mechanical performance, change of material and the
corrosion of some metal parts are also likely to occur. If the relative humidity is too low, the captive screw may become
loose due to the shrinking of insulating sheath. Meanwhile, the static electricity is likely to be produced in the dry weather,
which may jeopardize the CMOS circuit of the switch. The Higher the temperature is, the greater the damage to the switch
will be. The reliability of the switch will be then seriously affected and its service span will be shortened because of
exposure to high-temperature environment for a long term. The ultra-high temperature will speed up the aging process of
the insulating material.
3.2.2 Laser Safety
In operating status, it is prohibited to stare into the open optical interface because the laser being transmitted through the
optical fiber will produces a small beam of light, it has very high power density and is invisible to human eyes, when a beam
of light enters the eye, retinal may be burned.
֠
֠
֠
֠
Caution:
Staring at the laser beam inside the fiber could hurt your eyes.
3.3 Installation Tools
Phillips screwdriver
Flat-blade screwdriver
ESD-preventive wrist strap