Child Craft Single Dropside Crib/Daybed with Factory Installed Hidden Hardware Скачать руководство пользователя страница 4

4

PREPARATION FOR INSTALLATION OF DROPSIDE:
Loosen the four Slotted/Phillips Screws 

A

 (Dropside

only) which attach the Stabilizing Bar 

V

 to the Headboard

A A

 and Footboard 

Z

 to prepare for Dropside

 

X

X

X

X

X

installation. Back out these (4) Screws a full (8) revolu-
tions each, but do not remove the screws

. The Stablizing

Bar 

V

 will now be loose.

Install Dropside 

X

 by following substeps 

I  

 through

  IV

listed below. Refer to Diagram

(It would be helpful to

have a friend assist you with this procedure.) Note: the
outside location of Dropside 

X

X

X

X

X

 as shown in Dia-

gram.

I.  

Note: During the Dropside 

X

 installation procedure

use extreme caution when Top Tracks  and Lower Tracks
make contact with Upper Guide Bushings 

C

C

C

C

C

  and Lower

Guide Pins 

D

D

D

D

D

 so as not to damage the finish of this crib.

II.

  Insert the Upper Guide Bushings 

C

C

C

C

C

 

(mounted  to

Footboard  

Z

 and Headboard   

AA

  in STEP 3) into the

Upper Tracks 

 

(metal)  which were factory mounted to

Dropside. Hold the Dropside 

X

 at approximately 30

degrees from vertical as shown in Diagram.

III.  

Once both ends are engaged, then carefully allow

Dropside 

X

    to slide downward. Then rotate the bottom

end of the Dropside 

X

 until it is nearly vertical. 

(Note:

Rotation will be stopped when the dropside 

X

 touches

the Lower Guide pins 

D

D

D

D

D

. Carefully let the Dropside   

X

slide down until it is as low as it can go.

IV.  

READ THIS STEP COMPLETELY BEFORE PROCEEDING.  Next, lift

Dropside 

X

X

X

X

X

 approximately two inches (2") vertically. This will put Dropside

X

 in the proper vertical alignment with the Lower Guide Pin 

D

D

D

D

D

 which will be

inserted into the Lower Tracks 

(Right & Left).

Flex the bottom end of the corner post on the Dropside

 

side of Footboard 

Z

away from the Dropside 

X

. The purpose of this process is to create a gap

for the Lower Guide Pins 

D

 to pass through so that the Lower Guide Pins

can be inserted into the long groove of the plastic Lower Tracks. As you
prepare to accomplish this please note the following:

If the Stabilizing Bar Assembly 

V

 was not loosened enough 

(as described

in PREPARATION FOR INSTALLATION OF DROPSIDE in the beginning
of this Step) there will not be enough slack to create the necessary gap
required for the Lower Guide Pin  

D

 to pass through. Prematurely forcing the

pin through a gap with inadequate clearance could damage the finish on the
Dropside 

X

. If your crib has too small of a gap, then lower Dropside 

X

 to its

lowest position and check to verify that preparation at beginning of Step 5
was performed correctly.

If it was performed correctly, but the gap is still too small, it may be because
the Stabilizing Bar 

V

 assembly  needs to be pulled away from the bottom rails

of the Footboard 

Z

 or Headboard 

AA

. Check to verify that the End Plates

M

 

N

 have been pulled away from the bottom rails until they touch the

underside of the heads of loosened Slotted/Phillips Machine Screws 

A

A

A

A

A

.

After the Lower Guide Pin 

D

D

D

D

D

  has been installed into the long groove on

Footboard 

Z

, then repeat this process on Headboard 

AA

. After both Lower

Guide Pins 

D

 are installed, very carefully and slowly raise the Dropside 

X

up until it locks into its raised position. Be very careful to watch to ensure that
the Lower Guide Pins 

D

 located in the grooves do not slip out during the

process of raising  Dropside 

X

.

Refer to Diagram  3. Tighten the (4) Slotted/Phillips Machine Screws 

A

A

A

A

A

 which

were installed in Step 3 to attach Stabilizing Bar 

V

 to Headboard 

AA

 and

Footboard 

Z

   but were loosened in Step 5. Be sure the (4) Slotted/Phillips

Machine Screws 

A

A

A

A

A

  are tightened securely. Check these screws periodically

and tighten if needed.

Check the function of Dropside 

X

. To lower the Dropside, lift

up on the Dropside top rail with your hand near the middle and
then press in with your knee on the center of the Dropside
bottom rail. The Dropside will then lower. To lock the Dropside
in the raised position, just lift it up until it locks into place.
Always verify that both ends of the Dropside are locked in  the
raised  position whenever child is placed  in crib. Only lower
the Dropside when attending to child. Lower crib Dropside 

X

X

X

X

X

prior to proceeding with Step 6.

S

TEP

 5 - D

IAGRAM

 5: 

 

I

NSTALLATION

 

OF

 D

ROPSIDE

.

CCH02710:01/00

II

II

II

II

II

.

  Engagement

of Metal Top
Track and
Upper Guide
Bushing 

C

C

C

C

C 

will

start at bottom
of Metal Top
Track 

(see

enlarged
section view
below).

30°

II

ENLARGED SECTION VIEW

Engagement of Metal Top
Track and Upper
Guide Bushing 

C

C

C

C

C

III

.

 Lower Track

           ( Plastic)
NOTE: Place short groove
            toward inside of crib.

FLEX

Dropside

 

Post

IV

IV

IV

IV

IV

.

  ENLARGED VIEW

IV

Then insert Lower

Guide Pin 

into long

groove in Lower Track
(plastic).

Corner post of Footboard 

ZZZZZ

long groove

Corner post of Footboard 

ZZZZZ

X

Z

U

D

H

X

C

Z

Z

Top Metal Track

X

Outside of Dropside 

X

X

X

X

X

Содержание Single Dropside Crib/Daybed with Factory Installed Hidden Hardware

Страница 1: ...ck Nuts actual size 4 Casters 20 Pan Head Machine Screws actual size 2 Flat Head Machine Screws actual size 2 End Plates Right 2 End Plates Left 1 Allen Wrench 4 Allen Bolts actual size style may vary CHILD CRAFT INDUSTRIES INC P O Box 444 Salem IN USA 47167 0444 PH 812 883 3111 FAX 812 883 1819 http www childcraftind com ASSEMBLY DIRECTIONS AND PARTS LIST D G H I J L S U 2 Stabilizing Bars attach...

Страница 2: ...for a part or literature for your crib DO NOT SUBSTITUTE PARTS 2 PREPARATION metal threads of Lock Nuts G to be inserted first over Pan Head Machine Screws I I I I I as shown in Enlarged Section View Be sure to use the proper receiving holes in Spring W W W W W as shown This procedure will be accomplished from the underside of Spring W W W W W Tighten all 4 Pan Head Machine Screws I I I I I while ...

Страница 3: ...A AA AA AA Insert an Allen Bolt U U U U U into each of the 4 receiving holes and allow each to pass through the corner posts of Headboard AA AA AA AA AA and Footboard Z Z Z Z Z then into the receiving holes in each end of the Stationary Side Y Y Y Y Y Insert each of the 4 K D Bolt Plugs L L L L L as shown Pull out each Allen Bolt U U U U U just enough to allow the K D Bolt Plug L L L L L to be ful...

Страница 4: ...amage the finish on the Dropside X If your crib has too small of a gap then lower Dropside X to its lowest position and check to verify that preparation at beginning of Step 5 was performed correctly If it was performed correctly but the gap is still too small it may be because the Stabilizing Bar V assembly needs to be pulled away from the bottom rails of the Footboard Z or Headboard AA Check to ...

Страница 5: ... W W W again tighten all Pan Head Machine Screws securely as directed Locate the 4 Casters H H H H H insert one into socket in each lower corner post of Headboard AA AA AA AA AA and Footboard Z Z Z Z Z Caster H H H H H design may vary according to your particular model CAUTION If crib is placed on exceptionally thick carpet take care when crib is rolled as Casters H H H H H could catch on thick ca...

Страница 6: ...0444 PH 812 883 3111 FAX 812 883 1819 http www childcraftind com ENGLISH MADE IN USA Φ Φ Φ Φ ΦANYMATTRESSUSEDINTHISCRIBMUSTBE ATLEAST27 1 4INCHES 69CENTIMETERS BY51 5 8INCHES 131CENTIMETERS WITH ATHICKNESSNOTEXCEEDING6INCHES 15 CENTIMETERS The dimensions of the mattress shall be taken from seam to seam or edge to edge where appro priate Φ Φ Φ Φ ΦUPONCOMPLETIONOFASSEMBLYBESURE ALLSCREWS BOLTSANDFAS...

Отзывы: