CHIKO AIRTEC CBA-1000AT2-HC-DSA-V1 Скачать руководство пользователя страница 16

チコーエアーテック株式会社 

Copyright  CHIKO  AIRTEC  CO.,  LTD.  2013 

 

 

 

  16

 

 

 

 

5.3 

遠隔操作と本体操作について 

Remote operation and operation from main body

 

 

遠隔操作で

ON/OFF

する場合は、④と⑧を短絡させておきます。

 

①を短絡

The wire [1] is short-circuited.

ON

 

①を短絡しない

The wire [1] is not short-circuited

OFF

 

(「各線の色と信号について」の表を参照ください)

 

Short-circuit the wires [4] and [8] each other when turning ON and OFF the dust collector by remote 
operation. 
(Refer to the table in 

“Color and signal of each wire”) 

 

 
 
 

 

Short-circuit pin

  and pins 

④⑧

  for ON/OFF.                  Keep pins

  and

  short-circuited.

 

 

 

本体操作で

ON/OFF

して信号を取り出す場合は、④と⑧を短絡させないでください。

 

5.2

各線の色と信号について」の説明に従い、必要な出力信号を取り出して下さい。

 

Do  not  short-circuit  the  wires  [4]  and  [8]  each  other  when  transferring  signals  by  turning  ON  and 
OFF the dust collector from the main body. 
Transfer required output signals in accordance with the explanation in 

“5.2 Color and signal of each 

wire

” 

 
 

 

能力レベルを変更する時にレベルが記憶される為、主電源を切っても前回使用レベルで記憶されます。

 

When  the  capacity  level  is  changed,  the  set  level  is  stored  in  memory.  The  set  capacity  level 

remains in memory even after the main power switch is turned off.

 

 

リモート操作移行中に本体側で能力レベルを変更する場合は、⑦を短絡していない状態で

 

本体

AT

パネルの

ON

ボタンを押しながら

Lo, Hi 

で変更することが可能です。

 

遠隔操作で、(⑦ピン)能力レベルの変更を行っている場合、本体側での能力レベル変更は不可となります。

 

To change the capacity level using the buttons on the main unit when switching to remote operation, 
check that pin

  is not shorted-circuited, then press and hold the ON button on the AT panel of the 

main unit, and press the Lo or Hi button. 
If the capacity level (pin

) is being changed by remote control, the buttons on the main unit cannot 

be used to change the capacity level.

 

 

 

能力レベルを変更する時にレベルが記憶される為、万が一主電源を切っても前回使用レベルを

 

記憶しています。

 

When  the  capacity  level  is  changed,  the  set  level  is  stored  in  memory.  The  set  capacity  level 
remains in memory even after the main power switch is turned off.

 

.

 

 

 
 
 
 
 
 
 

 

短時間で、主電源を

ON/OFF

するとモータの故障の原因となりますので、

AT

パネ

ル側で

ON/OFF

してください。

 

If the main power is turned ON/OFF in short intervals, the motor 
may malfunction. Be sure to turn the main power ON/OFF at the   

AT panel.

 

 

①ピン

 

④⑧ピンに①ピンを短絡して

ON/OFF

する

 

④と⑧を短絡させておきます。 

④ピン

 

⑧ピン

 

Содержание CBA-1000AT2-HC-DSA-V1

Страница 1: ...arker is an energy saving type clean box that realizes air technology in a compact body Please read this instruction manual thoroughly and handle this machine correctly so that you can use it safely f...

Страница 2: ...osene paint etc Explosive dust Aluminum magnesium titanium zinc epoxy etc Dust containing sparks Dust containing sparks generated by high speed cutters grinders welding machines etc Fire sources Cigar...

Страница 3: ...AT panel 9 4 3 Remote connector 12 4 4 Confirmation before operation 13 4 5 Operation procedure 13 5 Remote Cable Sold Separately 14 5 1 Electrical circuit diagram 14 5 2 Color and signal of each wir...

Страница 4: ...t outdoors 0 40 80 Install the product in a place without dew condensation at room temperature ambient temperature 0 to 40 C humidity 80 or less High temperature and dew condensation may cause electri...

Страница 5: ...Dispose of the product properly as industrial waste 2 Confirmation and Preparation at Arrival After unpacking make sure that all parts are provided Contact our company immediately if parts are damage...

Страница 6: ...Secondary filter CHF 2030 50 Active Carbon Cassette ACC 3220 100 Exhaust filter HEP 3220 69 Remove the sticker before use 1 1 1 The sticker is pasted to the filter when shipping it To prevent the zeo...

Страница 7: ...econdary filter Protecting the circuit and the blower Active carbon cassette Absorbing the odor HEPA Exhaust HEPA filter Exhaust treatment 1 Primary filter Zeolite Cassette Filter Shaking motor Active...

Страница 8: ...o match usage conditions the installed flange can be changed without having to use any tools Replacement flanges are sold separately 75 Removal method Turn the flange counterclockwise to remove it Tur...

Страница 9: ...ilure Never adopt star burst connection that may cause voltage drop If voltage drop occurs longer time is required for startup 3 ON OFF 30 3 ON OFF It causes the trouble if ON OFF is frequently operat...

Страница 10: ...to perform vibration manually after a short operating time cumulative time of less than 1 hour press the OFF button then press and hold the Manual Vibration button for 20 seconds Vibration continues...

Страница 11: ...utomatically activates the vibration function Operating Pressure Indication Pa Indicates the current operating pressure level kPa 0 2 Pa 0 2 Pa When the equipment is not operating the pressure indicat...

Страница 12: ...ours Indicator lamp Shaking 0 1hour After automatic shaking Off Hand operation shaking 1hour After automatic shaking Light up Automatic shaking 24 Some estimate of the number of shaking times for 24 h...

Страница 13: ...icator lamp of AT panel lights AT ON Press the ON switch to start operation Confirm that abnormal sounds such as metallic sounds are not generated Confirm that the suction hose is connected securely 4...

Страница 14: ...Temperature correction is not provided Reference example 3 5 6 33 0 1 F Attach a noise limiter Approximately 33 0 1 F to the output terminals Nos 1 2 and 3 When adding inductors such as relays 33 0 1...

Страница 15: ...operation Red white Remote control operation switching signal Short circuits the wires 4 and 8 to start remote operation The AT panel is disabled while the wires 4 and 8 are short circuited Yellow Cha...

Страница 16: ...the capacity level is changed the set level is stored in memory The set capacity level remains in memory even after the main power switch is turned off AT ON Lo Hi To change the capacity level using...

Страница 17: ...ration 1 20 Auto operation shake off total up 1 hours After stopping the operation Auto moving for 20sec 20 Hand operation shake off After stopping the operation put on the manual shake off button for...

Страница 18: ...disconnect the power plug from the electrical outlet before starting inspection Do not confuse the back and front of the filter The filter grid frame should be located on the exhaust side Release 2 s...

Страница 19: ...sitioned at the center move the vibration arm to the end position before removing the guard or other parts 2 Remove 2 screws on both sides of the guard for shaking and get the guard off The guard for...

Страница 20: ...ve carbon ACC 3220 100 ACC ACC plate 1 ACC Move up the ACC plate and remove active carbon 1 4 Release 4 snap locks and remove exhaust filter cover Exhaust filter cover 4 snap locks 2 Remove exhaust fi...

Страница 21: ...it 2 Applicable fuse CBA 1000AT2 HC DSA V1 100 115V 10A 2 CBA 1000AT2 HC DSA V1 T 200V CE 220 240V 5A 2 Inspection item Frequency Description Filter case Before operation Is the case closed completely...

Страница 22: ...filters 3 30 After checking 1 to 3 above remove the cause of error and press the RESET switch Or turn OFF and ON the MAIN POWER switch to reset the error status Start the operation 30 minutes later Fu...

Страница 23: ...Copyright CHIKO AIRTEC CO LTD 2013 23 9 Indication of DANGER Labels 10 Electrical Circuit Diagram...

Страница 24: ...y side when hose is connected to the suction port Before the zeolite adheres to the Primary filter After 2 5 2 7 m 3 min Machinery Directive EN ISO12100 1 2003 EN ISO 12100 2 2003 EN ISO14121 1 2007 E...

Страница 25: ...emo about purchase Model Manufacturer s serial number Date of purchase Start of operation Your name Address Phone Person in charge LTD 562 0012 2 27 24 2 27 24 Hakushima Minoh City Osaka apan 562 0012...

Отзывы: