![Chigo CST-1000P30 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/chigo/cst-1000p30/cst-1000p30_technical-manual_2601259010.webp)
CHIGO CAC-FAN COIL
Part 9 Unit installation
9.1 Installation place
There is enough room for installation and maintenance.
The ceiling is horizontal, and its structure can endure the weight of the indoor unit.
The air outlet and the air inlet are not impeded, and the influence of external air is the least.
The air flow can reach throughout the room.
The connecting pipe and drainpipe could be extracted out easily.
There is no direct radiation from heaters
Caution
Location in the following places may cause malfunction of the machine. (If unavoidable, please consult
your local dealer.)
1. There exists petrolatum.
2. There is salty air surrounding (near the coast).
3. There is caustic gas (the sulfide, for example) existing in the air (near a hot spring).
4. The Volt vibrates violently (in the factories).
9.2 Install the Main Body
Please refer to the following figure for the hanging screw bolts.
Please install with Ø10 hanging screw bolts.
The handling to the ceiling varies from the constructions,
Consult the construction person for the specific condition.
1. The size of the ceiling to be handled------ Do keep the ceiling flat. Consolidate the roof beam for possible
vibration.
2. Cut off the roof beam.
3. Strengthen the place that has been cut off, and consolidate the roof beam.
Carry out the pipe and line operation in the ceiling after finishing the installation of the main body. While
choosing where to start the operation, determine the direction of the pipes to be drawn out. Especially in
case there is a ceiling, position the water refrigerant pipes, drain pipes, indoor lines to the connection
places before hanging up the machine.
The installation of hanging screw bolts.
Содержание CST-1000P30
Страница 7: ......