XBM1U/XBM1UP
Installation Instructions
10
Figure 10
(E) x 4, if necessary
(S)
(T)
(A-C or F-H) x 4
5
(D) x 4
(XBM1UP)
WARNING:
Exceeding the weight capacity can result in
serious personal injury or damage to equipment! It is the
installer’s responsibility to make sure the combined weight of
each display and attached accessories mounted to the
XBM1U/XBM1UP mount does not exceed 250 lbs (113.4 kg).
6.
Hang interface brackets (S and T) to single display rail (R).
(See Figure 11)
7.
Use 1/4-20 x 1 1/4” socket head cap screws (I) to secure
interface brackets (S and T) to rails for each display. Screws
must engage through both holes to be fully secured. (See
Figure 11)
NOTE:
Display positions may need to be adjusted after height
and/or plumb adjustments in order to maintain desired
alignment.
Figure 11
Column Cap Installation
NOTE:
If the top holes on columns will be used for cable
management, do NOT install column caps to columns
as illustrated below. See Cable Management section
for details.
1.
Use four 5/16-18 x 1/2” button head cap screws (U) to install
each column cap (K) to each column. (See Figure 12)
Figure 12
(I) x 2
underside view
7
behind column
(rear view)
(K)
1
(U) x 4
(rear view)