
Installation Instructions
WP2XS, WP2XUS
7
Site Requirements
Figure 3
(Must be centered over two studs)
Drywall
**1/2" minimum
Drywall Thickness
Short Throw Mount Installation Location
FRONT
(Both Sides of Stud)
There must be a minimum of
1-7/8" (48mm) clearance
inside wall
16" (on center) Studs
If back side of wall is unfinished, drywall must be installed
to a minimum of one stud left and right of the studs
being used to install the mount. Drywall must be
secured to studs with screws 12" on center
Steel Stud (2 x 4 / 25ga minimum)
Stud type and structural strength must conform to the North American
Specification for the Design of Cold-Formed Steel Structural Members.
**See hazard statement
on page 2!
[362, 125 18, C-Shape, S - Stud Section]
Содержание WP2XS
Страница 14: ...WP2XS WP2XUS Installation Instructions 14 ...
Страница 15: ...Installation Instructions WP2XS WP2XUS 15 ...