CHIEF STLU Скачать руководство пользователя страница 8

STLU

Installation Instructions

8

5.

Place vertical interface brackets (D) on display, ensuring:
(See Figure 6)

Upper hooks are towards

top

 of display.

Center of brackets (D) are as close to the center
of the back of display as possible after being
installed. Center of bracket is indicated by the
diamond-shaped hole.

6.

Install selected screws through washers (T and/or U, if
required) vertical interface bracket (D) and into display
mounting holes. (See Figure 6)

7.

Hang display onto top rail of table stand interface (C) using
hooks on top of vertical interface brackets (D). (See Figure
7)

8.

Gently set back of display against lower rail of table stand
interface. (See Figure 7)

Figure 7

9.

Use four 1/4-20 x 1/2" button head security cap screws (J)
and two interface clamp brackets (E) to secure vertical
interface brackets (D) to table stand interface (C). (See
Figure 8)

Figure 8

Cable Management

The STLU can be set up for two types of Cable Management.
One calls for the cables to be routed strictly through the pole
portion of the table stand. The other routes the cables through
the pole and through a pre-drilled hole in the desk.

Cable Management (pole only)

1.

Route cables from display into upper hole on pole portion of
table stand (B). (See Figure 9)

2.

Route cables down the pole and out of lower hole. (See
Figure 9)

Figure 9

Cable Management (through desk)

1.

Route cables from display into upper hole on pole portion of
table stand (B). (See Figure 10)

2.

Route cables down the pole and through hole drilled in desk
during desk installation. (See Figure 10)

3.

Install cable port cover (F) into lower hole on pole portion of
table stand (B). (See Figure 10)

Figure 10

7

8

(D) x 2

display

(C)

(E) x 2

9

(J) x 4

cable (typical)

1

2

3

2

1

(F)

Содержание STLU

Страница 1: ...struções de Instalação Istruzioni di installazione Installatie instructies Instructions d installation Large Hospitality Table Stand Spanish Product Description German Product Description Portuguese Product Description Italian Product Description Dutch Product Description French Product Description STLU ...

Страница 2: ...ents are properly assembled and installed using the instructions provided WARNING Failure to provide adequate structural strength for this component can result in serious personal injury or damage to equipment The mounting surface must be a minimum of 3 4 in depth for medium density fibreboard or particle board If mounting to another type of surface make sure surface can hold up to four times the ...

Страница 3: ... STLU 3 DIMENSIONS 15 75in MAX HEIGHT 400mm 23 62in MAX WIDTH 600mm 33in 8mm 15 61in 397mm 2 00deg ROLL ADJUST ON OFFSET SLOTS 50 13mm OFFSET MOUNTING HOLES 5 50in 140mm 4 47in 113mm STOPS AT 15 30 45 AND 90 ADJUSTABLE ROTATION ...

Страница 4: ...ave de bocas Chiave a punte aperte Steeksleutel Clé à fourche By Hand A mano Von Hand Com a mão A mano Met de hand À la main Hex Head Wrench Llave de cabeza hexagonal Sechskantschlüssel Chave de cabeça sextavada Chiave esagonale Zeskantsleutel Clé à tête hexagonale Pencil Mark Marcar con lápiz Stiftmarkierung Marcar com lápis Segno a matita Potloodmerkteken Marquage au crayon Drill Hole Perforar B...

Страница 5: ...face bracket A 1 clamping plate F 1 cable port cover G 3 1 4 20 x 2 1 2 H 4 1 4 20 x 1 2 J 4 1 4 20 x 1 2 K 1 10 24 x 1 2 L 3 3 16 Hardware Bag C 1 table stand security security N 4 M4x12mm P 4 M4x16mm Q 4 M5x16mm R 4 M6 x 16mm S 4 M8x16mm T 4 10 U 8 1 4 V 1 3 16 W 1 5 32 security security security security security security security E 2 interface clamp bracket M 1 10 24 x 1 2 ...

Страница 6: ...surface make sure surface can hold up to four times the combined weight of all equipment prior to mounting the STLU to surface 4 Drill three 5 16 holes at locations marked in Step 3 See Figure 2 NOTE If cables are going to be routed through the table an additional hole needs to be drilled in center of clamping plate A See Cable Management Section for details 5 Optional If cables are going to be ro...

Страница 7: ...hardware M R 8mm 6mm 5mm or 4mm and comparing with mounting holes on display See Figure 6 3 Select washers Refer to the Table 1 1 to determine which washers S and T to use for display installation NOTE No washers are required with installation using M8 diameter screws CAUTION Using screws of improper length may damage your display Proper screws will have adequate thread engagement without contacti...

Страница 8: ...ce clamp brackets E to secure vertical interface brackets D to table stand interface C See Figure 8 Figure 8 Cable Management The STLU can be set up for two types of Cable Management One calls for the cables to be routed strictly through the pole portion of the table stand The other routes the cables through the pole and through a pre drilled hole in the desk Cable Management pole only 1 Route cab...

Страница 9: ...Installation Instructions STLU 9 ...

Страница 10: ...STLU Installation Instructions 10 ...

Страница 11: ...Installation Instructions STLU 11 ...

Страница 12: ...straat 14 6003 DK Weert Netherlands P 31 0 495 580 852 F 31 0 495 580 845 Asia Pacific A Office No 1 on 12 F Shatin Galleria 18 24 Shan Mei Street Fotan Shatin Hong Kong P 852 2145 4099 F 852 2145 4477 Chief Manufacturing a products division of Milestone AV Technologies 8800 002058 Rev 04 2012 Milestone AV Technologies a Duchossois Group Company www chiefmfg com 04 12 ...

Отзывы: