background image

Installation Instructions

SL151

7

Installing in a Wood Framework (Joists)

1.

Use 1/4" x 1-1/2" (minimum) Grade 2 lag screws (not
provided)  to secure SL151 to the joists or wood framework,
using the mounting tabs located on the sides of the SL151
housing. (See Figure 9).

NOTE:

There are mounting tabs on each side and end of the

SL151. The SL151 only requires support on two
opposing sides.

IMPORTANT ! :

Wood framework must be constructed of

nothing larger than 2x6 wood studs across the rear of the
SL151.

The rear of the SL151 is the side with the test cord.

There are no size limitations for the wood framework on the
other three sides of the SL151.

Figure 9

CAUTION:

The lift MUST be installed square and parallel.

Avoid stressing or bending the lift during installation.

2.

Use the provided push button (D) to operate the SL151 up
and down, ensuring that all clearances are adequate.

Installing Projector on SL151

NOTE:

The projector is secured from the top by an SLB

bracket (a Listed accessory).

1.

Attach the SLB bracket to the projector following the
instructions included with the bracket.

2.

Attach the bracket with the projector to the SL151, adjusting
left or right by using the various attachment points in the
SL151.  (See Figure 10)

Figure 10

Adjustments

1.

FORWARD/BACKWARD

To shift projector mounting bracket backward or
forward, remove and save two screws on each side.

Move mounting bracket forward or backward as
required.

Reinstall and tighten screws.  (See Figure 11)

Figure 11

2.

YAW (Rotation)

Adjust one or the other side of the bracket backward or
forward by loosening two screws on each side. (See
Figure 12)

Adjust bracket as required.

Tighten screws. (See Figure 12)

Mounting
Tabs

Mounting
Tabs

rear

Attachment
Points

Содержание SMART-LIFT SL151

Страница 1: ...rference in a residential installation This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interfer...

Страница 2: ...ING TO REDUCE THE RISK OF BURNS FIRE ELECTRIC SHOCK OR INJURY TO PERSONS Always turn off power at source before putting on or taking off parts Use this mounting system only for its intended use as des...

Страница 3: ...elemento de fijaci n Befestigungsteil festziehen Apertar fixador Serrare il fissaggio Bevestiging vastdraaien Serrez les fixations Loosen Fastener Aflojar elemento de fijaci n Befestigungsteil l sen...

Страница 4: ...2 578 6 514 1 582 7 22 50 20 28 215 9 284 5 579 4 571 5 65 5 DIMENSIONS MILLIMETERS INCHES TABLE OF CONTENTS Disclaimer 2 Tools Required For Installation 3 Parts 3 Legend 3 Dimensions 4 Installation...

Страница 5: ...and wire the push button assembly D to contacts 1 red and 6 black See Figure 3 Figure 3 6 Plug in the SL151 test cord See Figure 2 NOTE See Figure 2 for location of external wiring terminal See Figur...

Страница 6: ...sibility to make certain the structure to which the lift is being mounted is capable of supporting five times the weight of the lift and all attached equipment Reinforce the structure as required befo...

Страница 7: ...lation 2 Use the provided push button D to operate the SL151 up and down ensuring that all clearances are adequate Installing Projector on SL151 NOTE The projector is secured from the top by an SLB br...

Страница 8: ...for up and down movement of the lift 5 Secure cables as necessary using supplied mounting pads E and cable ties B CAUTION KEEP SL151 OPEN WHILE PROJECTOR IS RUNNING OR IN COOLING MODE Premature bulb f...

Страница 9: ...See Figure 16 for terminal descriptions functions and wiring options Re Attaching Ceiling Panel 1 Line up rectangular holes in ceiling panel with clips on ends of rods and re attach the ceiling panel...

Страница 10: ...0 Table 1 WIRING TABLE Figure 16 NOTE The numbers listed in the SL151 Internal and SL151 External columns refer to the corresponding numbers located where indicated in the wiring pictures See Figure 1...

Страница 11: ...Installation Instructions SL151 11 Table 2 INTERNAL TERMINAL DESCRIPTIONS...

Страница 12: ...SL151 Installation Instructions 12 Figure 17...

Страница 13: ...Installation Instructions SL151 13...

Страница 14: ...SL151 Installation Instructions 14...

Страница 15: ...Installation Instructions SL151 15...

Страница 16: ...Company www chiefmfg com 04 10 USA International A 8401 Eagle Creek Parkway Savage MN 55378 P 800 582 6480 952 894 6280 F 877 894 6918 952 894 6918 Europe A Fellenoord 130 5611 ZB EINDHOVEN The Nether...

Отзывы: