background image

I N S T A L L A T I O N   I N S T R U C T I O N S

This device complies with part 15 of the FCC rules. Operation is subject to the following 2 conditions: (1) This device may not cause harmful
interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

This equipment has been tested and found to comply with the limits of a Class B digital device, pursuant to Part 15 of the FCC rules. These limits are
designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate
radio frequency energy, and if not installed and used in accordance with the instructions, may cause harmful interference to radio or television
communications. However, there is no guarantee that the interference will not occur in a particular installation. If this equipment does cause harmful
interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct
the interference by one of the following measures:

Reorient or relocate the receiving antenna

Increase the separation between the equipment and receiver

Connect the equipment to an outlet on a circuit other than that to which the receiver is connected

Consult the dealer or and experienced radio/TV technician for help

SL236

SMART-LIFT™ Electric Ceiling Lift

Содержание SMART-LIFT SL-236

Страница 1: ...radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio or television communications However there is no guarantee that the interference will not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off an...

Страница 2: ...t recommended by the manufacturer Never operate this mounting system if it has a damaged test cord or test plug If it is not working properly during testing return the mounting system to a service center for examination and repair Keep the test power cord away from heated surfaces Never operate the mounting system with the air openings blocked Keep the air openings free of lint hair and the like N...

Страница 3: ...SL236 3 TOOLS REQUIRED FOR INSTALLATION PARTS x1 I M A 1 B 1 C 5 D 1 E 1 F 5 G 4 6 32 x 3 16 H 2 Ceiling Lift Push Button Assembly Cable Tie Cable Tie Mount External Terminal Cover Plate Rubber Grommet Jumper Wire SL236FD Shown ...

Страница 4: ...lösen Desapertar fixador Allentare il fissaggio Bevestiging losdraaien Desserrez les fixations Disclaimer 2 Tools Required For Installation 3 Parts 3 Legend 4 Dimensions 5 Installation Requirements 6 Power Requirements 6 Pre test Lift Before Installation 6 Power Requirements And Wiring 7 Grounding Instructions 7 Installing In Ceiling 7 Installing In A Suspended Ceiling SL236SP 7 Installing In A Wo...

Страница 5: ...INCHES 606 6 CURRENT 9 26 235 2 MAX 9 91 251 7 MIN 7 78 197 6 25 12 700 0 719 1 4 34 3 00 23 00 20 50 10 25 12 25 11 12 65 16 5 1 06 26 9 24 94 23 88 36 00 MAX 1 07 27 2 41 10 4 MAXIMUM AVAILABLE SPACE FOR PROJECTOR AND EQUIPMENT HxWxD 9 25 x 20 50 x 22 75 INCHES 520 7 76 2 260 4 584 2 638 0 110 2 27 56 28 31 23 88 REMEMBER TO ADD 375 TO 1 00 9 5 TO 25 4mm TO THE MAX 9 91 251 7mm OF YOUR PROJECTOR...

Страница 6: ...structions 2 Attach supports not provided to the top of lift See Figure 1 Figure 1 3 Suspend the lift at least 3 1 2 ft above a surface from a suitable structure such as saw horses ladders or tables 4 Remove and save two screws holding side electrical cover in place See Figure 2 5 Remove electrical cover See Figure 2 Figure 2 6 Place the jumper wire E on the external wiring terminal contacts label...

Страница 7: ... when the lift is at its bottom position and it will move up Press while the lift is moving and it will stop Leave SL236 in the closed position INSTALLING IN CEILING WARNING IMPROPER INSTALLATION CAN LEAD TO LIFT FALLING CAUSING SEVERE PERSONAL INJURY OR DAMAGE TO EQUIPMENT It is the installers responsibility to make certain the structure to which the lift is being mounted is capable of supporting...

Страница 8: ...tional accessory to the SL236SP if applicable following instructions included with the kit 8 Insert the ceiling grid edge surrounding the SL236SP into the side channel of the SL236SP See Figure 7 NOTE The side channel of the lift will support the weight of the grid and ceiling tiles Figure 7 CAUTION The lift MUST be installed square and parallel Do NOT stress or bend the lift during installation 9...

Страница 9: ...Grade 2 lag screws not provided to secure SL236FD to the joists or wood framework using the mounting tabs located on the sides of the SL236FD housing See Figure 10 NOTE There are three mounting tabs on each side and two mounting tabs on the front of the SL236FD There are three mounting holes in the back of the SL236FD The SL236FD must be installed using the back mounting holes AND the front two mo...

Страница 10: ...justment bracket See Figure 12 Figure 12 Adjustments 1 TRAVEL SHOW ADJUSTMENT CAUTION Do not overadjust exceed maximum travel length To adjust the travel of the lift mechanism insert a Phillips screwdriver into the access hole found at the left rear corner of the lift NOTE The access hole may be covered by ceiling tile in the SL236SP model Shorten travel by turning adjustment screw clockwise one o...

Страница 11: ... or down in the side holes on one side or the other by loosening nuts Adjust and tighten nuts on bracket See Figure 16 Figure 16 Routing Cables CAUTION Do NOT attach cables to lower lifting arms or sides of projector bracket Damage may result when lift is raised 1 Lower SL236 to service position 2 Route and secure electrical and video cables using installed cable clips See Figure 17 Remove nut and...

Страница 12: ...thermal overload resets usually within 3 to 5 minutes Connecting to Power Supply IMPORTANT This product must be connected to a grounded metal permanent wiring system or an equipment grounding conductor must be run with the circuit conductors and connected to the equipment grounding terminal or lead on the product 1 Disconnect and remove power inlet from interior junction box 2 Hardwire unit to a 1...

Страница 13: ...13 Table 1 WIRING TABLE Figure 18 NOTE The numbers listed in the SL236 Internal and SL236 External columns refer to the corresponding numbers located where indicated in the wiring pictures See Figure 18 EXTERNAL WIRING INTERNAL WIRING ...

Страница 14: ...SL236 Installation Instructions 14 Table 2 INTERNAL TERMINAL DESCRIPTIONS ...

Страница 15: ...Installation Instructions SL236 15 Figure 19 ...

Страница 16: ... com 04 14 USA International A 8401 Eagle Creek Parkway Savage MN 55378 P 800 582 6480 952 894 6280 F 877 894 6918 952 894 6918 Europe A Fellenoord 130 5611 ZB EINDHOVEN The Netherlands P 31 0 40 2668620 F 31 0 40 2668615 Asia Pacific A Office No 1 on 12 F Shatin Galleria 18 24 Shan Mei Street Fotan Shatin Hong Kong P 852 2145 4099 F 852 2145 4477 ...

Отзывы: