Installation Instructions
PST 2000 Series
5
PST INSTALLATION
(Cont’d)
Mount the PST
To mount the PST, do the following:
1. Holding the PST against the wall, select the pair of
mounting holes that best suits your situation (see
Figures 5, 6, and 7).
NOTE:
The mounting holes are slotted to allow for a
small degree of lateral movement. The mount can
be centered, or shifted to the left of center, or
right of center depending on stud location.
2. Depending on your situation, install the lag bolts (50)
and washers (60) into the pilot holes previously
drilled, as described below.
Option A.
Install four 5/16” x 2-½” lag bolts
(50) and four 5/16” washers (60) (two top and
two bottom) into the mounting holes, centering
the PST on dual wood studs 16” apart on center
as shown in Figure 5.
OR
Option B.
Install four 5/16” x 2-½” lag bolts (50)
and four 5/16” washers (60) (two top and two
bottom) into the mounting holes that are
right of
center
on dual wood studs 16” apart as shown in
Figure 6.
OR
Option C.
Install four 5/16” x 2-½” lag bolts
(50) and four 5/16” washers (60) (two top and
two bottom) into the mounting holes that are
left
of center
on dual wood studs 16” apart dual
wood studs 16” apart on center as shown in
Figure 6.
OR
Option D.
Install four 5/16” x 2-½” lag bolts
(50) and four 5/16” washers (60) (two top and
two bottom) into the mounting holes, centering
the PST on dual wood studs 24” apart on center
as shown in Figure 7.
3. Tighten all lag bolts.
Figure 5. Mounting Holes – 16” Apart on Center
(Option A)
Figure 6. Mounting Holes – 16" Apart on Center
(Options B and C)
Figure 7. Mounting Holes – 24" Apart On Center
(Option D)
Option B
Option C
Option A
Option D
Содержание PST 2000 Series
Страница 7: ...Installation Instructions PST 2000 Series 7 ...
Страница 8: ...Installation Instructions PST 2000 Series 8 ...