background image

PACHFK2

Installation Instructions

6

2.

Orient header and footer brackets (A) within the cut-out
drywall area. (See Figure 3)

Figure 3

3.

Raise and lower brackets (A) until brackets rest against
center stud. (See Figure 4)

NOTE:

Front flange on both upper and lower bracket should be

slid behind drywall. (See Figure 5)

Figure 4

Figure 5

4.

Make sure upper and lower brackets are level and there is
a minimum of 20.375" between them at bracket centers and
at both ends of brackets.

5.

Secure upper and lower brackets to center studs using four
08 x 1-1/2" Phillips flat head wood screws (B) at center
studs.  (See Figure 6)

6.

Secure upper and lower brackets to side studs using
sixteen M7 x 40mm connector screws (C) and M4 Allen
head bit (D). (See Figure 6)

Figure 6

(A) x 2

2

(A) x 2

Center Stud

Center Stud

3

Front
flange
of bracket

Drywall

(B) x 4

(C) x 16

6

5

Содержание PACHFK2

Страница 1: ...O N I N S T R U C T I O N S Instrucciones de instalación Installationsanleitung Instruções de Instalação Istruzioni di installazione Installatie instructies Instructions d installation IN WALL ENCLOSURE FRAMING KIT PACHFK2 ...

Страница 2: ...lerts you to the possibility of damage or destruction of equipment if you do not follow the corresponding instructions WARNING Failure to read thoroughly understand and follow all instructions can result in serious personal injury damage to equipment or voiding of factory warranty It is the installer s responsibility to make sure all components are properly assembled and installed using the instru...

Страница 3: ...Chave de bocas Chiave a punte aperte Steeksleutel Clé à fourche By Hand A mano Von Hand Com a mão A mano Met de hand À la main Hex Head Wrench Llave de cabeza hexagonal Sechskantschlüssel Chave de cabeça sextavada Chiave esagonale Zeskantsleutel Clé à tête hexagonale Pencil Mark Marcar con lápiz Stiftmarkierung Marcar com lápis Segno a matita Potloodmerkteken Marquage au crayon Drill Hole Perforar...

Страница 4: ...llation Instructions 4 TOOLS REQUIRED FOR INSTALLATION PARTS 3 16 Included M4 Allen Head Bit Included A 2 B 4 08 x 1 1 2 C 16 M7 x 40mm F 8 5 16 18 x 5 8 E 8 1 4 G 1 3 16 D 1 M4 Allen Head Bit Header footer brackets ...

Страница 5: ... behind mounting surfaces is free of electrical wires and cables before cutting drilling or installing fasteners WARNING EXPLOSION AND FIRE HAZARD CUTTING OR DRILLING INTO GAS PLUMBING CAN CAUSE DEATH OR SERIOUS PERSONAL INJURY ALWAYS make certain area behind mounting surfaces is free of gas water waste or any other plumbing before cutting drilling or installing fasteners 2 Using a stud sensor loc...

Страница 6: ...4 Figure 5 4 Make sure upper and lower brackets are level and there is a minimum of 20 375 between them at bracket centers and at both ends of brackets 5 Secure upper and lower brackets to center studs using four 08 x 1 1 2 Phillips flat head wood screws B at center studs See Figure 6 6 Secure upper and lower brackets to side studs using sixteen M7 x 40mm connector screws C and M4 Allen head bit D...

Страница 7: ...ackets A See Figure 7 Figure 7 8 Secure PAC 502 enclosure to brackets using eight 1 4 flat washers E and eight 5 16 18 x 5 8 button head cap screws F using the 3 16 hex wrench G See Figure 8 CAUTION PAC 502 enclosure must be secured on both sides to side studs using lag screws and bushings following the installation instructions provided with the PAC502 accessory Figure 8 7 F x 8 E x 8 8 ...

Страница 8: ...p Company www chiefmfg com 09 10 USA International A 8401 Eagle Creek Parkway Savage MN 55378 P 800 582 6480 952 894 6280 F 877 894 6918 952 894 6918 Europe A Fellenoord 130 5611 ZB EINDHOVEN The Netherlands P 31 0 40 2668620 F 31 0 40 2668615 Asia Pacific A Office No 1 on 12 F Shatin Galleria 18 24 Shan Mei Street Fotan Shatin Hong Kong P 852 2145 4099 F 852 2145 4477 ...

Отзывы: