Installation Instructions
NW2F8-12
7
1.
Using the mounting plate (C) as a template, mark the wall at
the top mounting slots. (See Figure 3)
2.
Drill one 5/16" pilot hole at both marks made in Step 1. (See
Figure 3)
3.
Install an anchor (E) into each pilot hole using a hammer,
making sure that the anchor is flush with the wall.
Figure 3
4.
Use two 5/16 x 2-1/2" lag bolts (F) and two 5/16" flat
washers (D) to attach top of mounting plate (C) to anchors
in wall. (See Figure 2)
5.
Mark the attachment points for the lower mounting slots.
(See Figure 3)
6.
Drill one pilot hole at each marking for lower mounting
holes. (See Figure 3)
7.
Install an anchor (E) into each pilot hole using a hammer.
8.
Use two 5/16 x 2-1/2" lag bolts (F) and two 5/16" flat
washers (D) to attach the mounting plate (C) to the wall
through the lower mounting holes. (See Figure 3)
Installing to a Steel Stud Wall
IMPORTANT ! :
See
Site Requirements
section before
proceeding with Steel Studs installation to ensure
installation site meets requirements! The drywall must
have a minimum thickness of 1/2"!
Determine location of NW2 wall rack. Use stud finder to locate
steel studs.
WARNING:
ELECTRICAL SHOCK HAZARD! CUTTING
OR DRILLING INTO ELECTRICAL CORDS OR CABLES
CAN CAUSE DEATH OR SERIOUS PERSONAL INJURY!
ALWAYS make certain area behind mounting surface is free
of electrical wires and cables before drilling or installing
fasteners.
WARNING:
EXPLOSION AND FIRE HAZARD! CUTTING
OR DRILLING INTO GAS PLUMBING CAN CAUSE DEATH
OR SERIOUS PERSONAL INJURY! ALWAYS make certain
area behind mounting surface is free of gas, water, waste, or
any other plumbing before cutting, drilling, or installing
fasteners.
1.
Using the mounting plate (C) as a template, mark the wall at
the top mounting slots.
2.
Drill one 1/2" pilot hole at both marks made in Step 1. (See
Figure 4)
Figure 4
4
(F) x 2
8
(F) x 2
5
6
1
2
7
(E) x 4
3
(C)
1
2
x 2
(C)