Installation Instructions
MSP-DCCUST1
7
NOTE:
Proceed to
Installing Short Throw Projector Arm to
Bracket
section to continue installation.
Steel Studs
IMPORTANT ! :
See
Site Requirements
section before
proceeding with Steel Studs installation to ensure
installation site meets requirements! The drywall must
have a minimum thickness of 1/2"!
1.
Determine mounting location on wall. Use stud finder to
locate steel studs.
2.
Line up four holes on mounting bracket with center of studs
at desired mounting location. (See Figure 4)
3.
Using mounting bracket as a template, mark four holes at
the four holes in bracket. (See Figure 4)
4.
Drill four 1/2" holes at marked locations on wall. (See
Figure 4)
Figure 4
5.
Hold metal channel on Toggler® 1/4-20 (BB) Snap-Toggle
(not included) flat alongside plastic straps and slide channel
through hole. (See Figure 5)
Figure 5
6.
Holding plastic straps on anchor, pull anchor away from wall
until channel rests flush behind wall making sure anchor
channel is positioned vertically on stud. (See Figure 6)
7.
Slide plastic cap on anchor towards wall until flange of cap
is flush with wall. (See Figure 6)
Figure 6
8.
Snap off plastic straps on anchor at wall by pushing side to
side, snapping off straps level with flange of plastic cap.
(See Figure 7)
9.
Repeat Steps 6 through 8 for each mounting hole.
Figure 7
3
4
x 4
x 4
Drywall
Plastic Straps
5
anchor x 4
Plastic Cap
Drywall
Anchor Metal Channel
SIDE VIEW
7
Steel Stud
6
Plastic Straps
Drywall
Anchor Metal Channel
Plastic Cap
SIDE VIEW