CHIEF MSB-6309 Скачать руководство пользователя страница 2

Installation Instructions  

MSB-6309 

 

 

2

3. 

J-Series VESA Interface Installation: 

Using the 10-24 button head cap screws along with the 10-24 Nylock nuts 

(provided with J-series mount), attach VESA interface from J-Series mount to center brackets (See Figure 4 
and Figure 5).

 

Figure 4 

 

Figure 5

4. 

Side Bracket Assembly: 

Attach center brackets to side brackets using the 10-24 button head cap screws (see  

Figure 6 and Figure 7).

 

Figure 6 

 

Figure 7

5. 

Bracket Installation:  

Place nylon spacers over mounting holes of screen and attach brackets to back of display 

using the M6 screws (see Figure 8 and Figure 9). Do not over tighten screws.

  

6. 

Follow the Chief mount instruction manual for screen installation.

 

Figure 8 

 

Figure 9 

Отзывы: