background image

Installation Instructions

Model PNR™

5

INSTALLATION

WARNING:

Improper installation can result in serious

personal injury!

WARNING:

It is the responsibility of the installer to

verify that the wall to which the PNR is anchored will
safely support five times the combined load of all
attached components and equipment. If not, reinforce
the structure before installing the PNR.

1.

Locate two wood studs 16” apart on center

2.

Determine the exact mounting location prior to
installation, considering screen size and the unit’s
total swing arm radius. Keep in mind that the PNR
must be mounted to wood studs that are 16” apart on
center.

NOTE:

Mount the PNR between parallel wall studs or

other supporting framework that is vertical or
horizontal.

3.

Using a stud sensor, locate the two wood studs where
you will mount the PNR.

4.

Draw a level plumb line to indicate the desired height
of the top mounting bracket.

5.

With an assistant, lift and hold the PNR against wall.
Use a pencil, awl, or small nail to mark the mounting
holes where two pilot holes will be drilled into the
center of the wood studs. Make sure the mounting
holes are level.

6.

With an assistant, lay the PNR down on the floor.

7.

Drill two pilot holes using a 9/32” drill bit where the
mounting holes were marked for anchoring the top
bracket. See Figure 1.

8.

Install two 3/8” x 2-1/2” lag bolts (50) and two 3/8” flat
washers (60), through PNR Top Bracket and into
upper  pilot holes.

NOTE:

Do not tighten the lag bolts down at this time.

Leave enough space between the wall and lag
bolts to hang the PNR.

Figure 1

Install the Mount

Mounting the top bracket

WARNING:

Improper installation can result in serious

personal injury!

1.

With an assistant, lift and hang the PNR on the two
lag bolts and washers previously installed on the wall.
(See figure 2).

NOTE:

Make sure washers are installed in front of the

top bracket, not behind the bracket.

2.

Slide the PNR into the desired position on the wall
and tighten the two lag bolts.

Mounting the bottom bracket

1.

Mark the two mounting holes in the bottom mounting
bracket (See figure 3). Make sure to align the holes
parallel to the holes drilled in the top bracket.

2.

Drill two pilot holes in the wall studs using a 9/32” drill
bit.

3.

Install two 3/8” x 2-1/2” lag bolts (50) and two 3/8”
washers (60) through PNR Bottom Bracket into the
lower pilot holes.

4.

Tighten all lag bolts.

Wood Studs

Wall

Pilot
Holes

16"

Содержание Large Flat Panel Dual Arm Wall Mount PNR

Страница 1: ...the two top lag bolts into the dual wall studs the installer hangs the PNR on its top bracket and installs two lag bolts in the bottom bracket Next the installer makes the height adjustment mounts the...

Страница 2: ...attached components or other equipment WARNING The weight of the display placed on the PNR must not exceed 200 lbs 90 72kg the maximum load capacity of the PNR WARNING Watch for pinch points Do not p...

Страница 3: ...Installation Instructions Model PNR 3 DIMENSIONAL DRAWING...

Страница 4: ...imension does not include the PSB interface bracket INTERFACES Table 2 lists the interface for the PNR TOOLS REQUIRED FOR INSTALLATION Allen wrench set Drill and bit set Wrench set NOTE Other tools ma...

Страница 5: ...e sure the mounting holes are level 6 With an assistant lay the PNR down on the floor 7 Drill two pilot holes using a 9 32 drill bit where the mounting holes were marked for anchoring the top bracket...

Страница 6: ...ment nut counterclockwise CCW to raise the unit height Install Cover Plates and End Caps NOTE The cover plates and end caps have pressure fitting ends that lock in place with each other 1 Install cove...

Страница 7: ...ngaged in mounting holes NOTE Holes are provided in the faceplate for use with a padlock or similar locking device if desired In addition the pin and nut may be removed from the upper holes and moved...

Страница 8: ...nt will cause excessive wear and may distort adjustment components 1 Using a 9 16 wrench not provided slightly tighten or loosen lateral tilt tension adjustment nut See figure 12 2 Mount the display a...

Страница 9: ...ring the Swing Arms Right of Center With some disassembly and reassembly you can move the swing arms to the right of center by reconfiguring the mount Use the third and fifth slotted holes in the top...

Страница 10: ...djustment bar and wrench provided with the mount 2 Place adjustment bar into socket head cap screw located at swing arm pivot point See figure 16 NOTE The display may need to be repositioned in order...

Страница 11: ...and press pin down into Open position See Figure 19 WARNING DISPLAY MAY WEIGH IN EXCESS OF 40 LBS Always use two people and proper lifting techniques when installing or positioning display on mount 3...

Страница 12: ...Model PNR Installation Instructions 12...

Отзывы: