background image

FWGSK110

Installation Instructions

USA/International

A

8401 Eagle Creek Parkway, Savage, MN 55378

P

800.582.6480 / 952.894.6280

F

877.894.6918 / 952.894.6918

Europe

A

Fellenoord 130 5611 ZB EINDHOVEN, The Netherlands

P

+31 (0)40 2668620

F

+31 (0)40 2668615

Asia Pacific

A

Room 24F, Block D, Lily YinDu International Building
LuoGang, BuJi Town, Shenzhen, CHINA.

P

+86-755-8996 9226

F

+86-755-8996 9217

Chief Manufacturing, a products division
of Milestone AV Technologies

8832-000215 RevD

2009 Milestone AV Technologies, a

Duchossois Group Company

www.chiefmfg.com

07/09

Содержание FWGSK110

Страница 1: ...de Instala o Istruzioni di installazione Installatie instructies Instructions d installation Small Flat Panel Steel Stud Wall Mount Spanish Product Description German Product Description Portuguese P...

Страница 2: ...components are properly assembled and installed using the instructions provided WARNING Failure to provide adequate structural strength for the installation of this kit can result in serious personal...

Страница 3: ...NSTALLATION AND PARTS TOGGLER x1 I M A 1 D 4 G 4 C 1 E 4 B 2 J 3 F 4 K 3 H 4 M 1 M4 x 12 L 3 1 2 x 3 4 1 4 20 x 1 3 4 3 16 M4 x 20 M4 x 20 1 4 1 2 x 3 8 1 4 20 SNAPTOGGLE BB flat panel wall mount N 1...

Страница 4: ...that no other equipment should be mounted to the same stud Figure 1 Drywall 1 2 minimum Drywall Thickness Display Mount Installation Location FRONT Both Sides of Stud Must be centered on stud There m...

Страница 5: ...andslidechannelthroughhole SeeFigure3 Figure 3 7 Holding plastic straps on anchor L pull anchor away from wall until channel rests flush behind wall making sure anchor channel is positioned vertically...

Страница 6: ...ONLY as necessary to allow installation of Centris bracket 1 Ensure Centris bracket is able to swivel and tilt easily yet still be tight enough to hold display in desired position Adjust as required b...

Страница 7: ...overtighten CABLE MANAGEMENT 1 Attach all cables to display 2 Open the cable management bracket by sliding it towards the edge of the arm See Figure 9 NOTE If necessary cable management bracket attac...

Страница 8: ...tment screw counterclockwise towards the symbol If display rises on its own then rotate adjustment screw clockwise towards the symbol NOTE It may be necessary to raise or lower the height adjustable a...

Страница 9: ...Installation Instructions FWGSK110 9...

Страница 10: ...FWGSK110 Installation Instructions 10...

Страница 11: ...Installation Instructions FWGSK110 11...

Страница 12: ...5611 ZB EINDHOVEN The Netherlands P 31 0 40 2668620 F 31 0 40 2668615 Asia Pacific A Room 24F Block D Lily YinDu International Building LuoGang BuJi Town Shenzhen CHINA P 86 755 8996 9226 F 86 755 89...

Отзывы: