background image

Installation Instructions

 FWDSK110

3

TOOLS REQUIRED FOR INSTALLATION AND PARTS

TOGGLER

Ă

 

x1

I/M

A (1)

D (4)

G (4)

C (2)

E (4)

(3/16") 

B (4)

J (3)

F (4)

K (3)

H (4)

M (1)

(M4 x 12) 

L (3)

(1/2" x 3/4") 

(1/4"-20 x 1 3/4") 

1/2" (Ø13mm)

(3/16") 

(M4 x 20) 

(M4 x 20) 

(1/4") 

(1/2" x 3/8") 

(1/4"-20 SNAPTOGGLE BB) 

Содержание FWDSK110

Страница 1: ...de Instala o Istruzioni di installazione Installatie instructies Instructions d installation Small Flat Panel Steel Stud Wall Mount Spanish Product Description German Product Description Portuguese P...

Страница 2: ...voiding of factory warranty It is the installer s responsibility to make sure all components are properly assembled and installed using the instructions provided WARNING Failure to provide adequate st...

Страница 3: ...ons FWDSK110 3 TOOLS REQUIRED FOR INSTALLATION AND PARTS TOGGLER x1 I M A 1 D 4 G 4 C 2 E 4 3 16 B 4 J 3 F 4 K 3 H 4 M 1 M4 x 12 L 3 1 2 x 3 4 1 4 20 x 1 3 4 1 2 13mm 3 16 M4 x 20 M4 x 20 1 4 1 2 x 3...

Страница 4: ...that no other equipment should be mounted to the same stud Figure 1 Drywall 1 2 minimum Drywall Thickness Display Mount Installation Location FRONT Both Sides of Stud Must be centered on stud There m...

Страница 5: ...slide channel through hole See Figure 3 Figure 3 7 Holding plastic straps on anchor L pull anchor away from wall until channel rests flush behind wall making sure anchor channel is positioned vertica...

Страница 6: ...TO EQUIPMENT Inadequate thread engagement in display may cause display to fall Back out screws ONLY as necessary to allow installation of Centris bracket 1 Ensure Centris bracket is able to swivel an...

Страница 7: ...ly thread into display mounting holes 7 Using Phillips screwdriver install four screws D or H through the mounting holes in Centris bracket through the spacers F or G and into the display See Figure 8...

Страница 8: ...2 894 6918 Europe A Fellenoord 130 5611 ZB EINDHOVEN The Netherlands P 31 40 2668620 F 31 0 40 2668615 Asia Pacific A Room 30I Block D Lily YinDu International Building LuoGang BuJi Town Shenzhen CHIN...

Отзывы: