Page 5 of 40
Bulletin
441G
LIST OF TABLES
Table 1. Fan Pad Distance from Bin Wall for use with Caldwell Drying Transition
12
Table 2. Fan Pad Distance from Building for use with Caldwell Wall Adaptor
12
Table 3. Fan Model Specifications for Tube Axial Aeration & Drying Fans
13
Table
4.
Axial
Fan
Housing
Dimensions 18
Table 5. Electrical Service for Single Phase Operation 230 Volt
19
Table 6. Electrical Service for Three Phase Operation 230/460 Volt
19
Table 7. Electrical Service for Three Phase Operation 575 Volt
19
Table 8. Normal Time for Switchless Motor to Reach Full Speed for 230 Volt
20
Table 9. Housing, Screen Guard, Control Enclosure Replacement Parts
34
Table
10.
Motor,
Blade
Replacement
Parts
35
Table 11. Contactor or Holding Coil for Converting from 460Volt to 230Volt
35
Table 12. Control Enclosure Parts (Furnas/Siemens Parts)
36
Содержание Caldwell AF12-751
Страница 2: ...Page 2 of 40 Bulletin 441G ...
Страница 23: ...Page 23 of 40 Bulletin 441G Figure 16 Wiring Schematic for AF12 751 Fan ...
Страница 24: ...Page 24 of 40 Bulletin 441G Figure 17 Wiring Schematic for AF18 11 Fan ...
Страница 25: ...Page 25 of 40 Bulletin 441G Figure 18 Wiring Schematic for 230 Volt Single Phase Axial Fan ...
Страница 26: ...Page 26 of 40 Bulletin 441G Figure 19 Wiring Schematic for 230 Volt Three Phase Axial Fan ...
Страница 27: ...Page 27 of 40 Bulletin 441G Figure 20 Wiring Schematic for 460 Volt Three Phase Axial Fan ...
Страница 28: ...Page 28 of 40 Bulletin 441G Figure 21 Wiring Schematic for 575 Volt Three Phase Axial Fan START STOP SWITCH ...
Страница 38: ...Page 38 of 40 Bulletin 441G NOTES ...
Страница 39: ...Page 39 of 40 Bulletin 441G NOTES ...
Страница 40: ...Page 40 of 40 Bulletin 441G ...